108 W 55th Half St
Austin, TX 78751
108 W 55th Half St: 3 projects on record
City of Austin lists 3 filings across 3 projects at 108 W 55th Half St, Austin, TX 78751 since March 18, 2024. The most recent, filed September 9, 2024, covers: “Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck”.
Compiled from City of Austin records · updated Sep 9, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Sep 9, 2024
- since Mar 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
- AppliedDec 21, 2023
- IssuedSep 9, 2024
- WorkSep '24 – Dec '24
- Final inspectionDec 20, 2024
Passed final inspection Dec 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInterior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
City of Austin permitElectrical PermitFinal- Record
- 2024-019582 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
City of Austin permitPlumbing PermitFinal- Record
- 2024-019582 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck
City of Austin permitBuilding PermitFinal- Record
- 2024-019582 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 108 W 55th Half St
What is being built at 108 W 55th Half St?
The latest filing (City of Austin permit 2024-019582 EP, September 9, 2024) covers interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck.
How many permits and filings does 108 W 55th Half St have?
3 filings across 3 projects, from March 18, 2024 to September 9, 2024.
Is there other construction near 108 W 55th Half St?
Yes. Nearby filings include 109 W 55th Half St (p&b 17 sewer line under house, Aug 21, 2025); 102 W 55th Half St (replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base, Feb 5, 2025); 202 W 55th Half St (addition of second story to existing sfr, May 15, 2025).
How do I get alerts for new permits at 108 W 55th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 109 W 55th Half StAug 21, 2025P&b 17 sewer line under house · 45 m away
- 102 W 55th Half StFeb 5, 2025Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base · 46 m away
- 202 W 55th Half StMay 15, 2025Addition of second story to existing sfr · 62 m away
- 100 W 55th Half StDec 21, 2023Installation of roof-mounted solar array system and solar battery · 67 m away
- 205 W 55th Half StMar 18, 2025Install new 8.28kw rooftop solar system to existing residential only · 88 m away
- 206 W 55th Half StMar 4, 2024Removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan · 92 m away
- 101 W Koenig LnJan 26, 2024Commercial re-roof (metal retrofit - tpo overlay) - remove existing eps flute fill 1/2 fiberboard and 60 mil tpo to the existing metal roof and replace with new eps flute fill 1/2 fiberboard and 60 mil tpo · 92 m away
- 200 W 56th StJun 3, 2026Temp power loop · 95 m away
- 110 W 55th StJul 12, 2024Replace 50 of sewer yard line · 99 m away
- 104 W 55th StMay 18, 2026Express - replace three existing old windows by installing three new size for size replacement windows · 102 m away
- 5513 Link AveOct 28, 2026Base: installing a backup battery system and additional meter socket · 103 m away
- 5511 Link AveSep 28, 2026Upgrade of existing overhead service to 200 amps to include current codes and standards · 106 m away