109 W 55th Half St
Austin, TX 78751
109 W 55th Half St: 1 project on record
City of Austin lists 1 filing across 1 project at 109 W 55th Half St, Austin, TX 78751. The most recent, filed August 21, 2025, covers: “P&b 17 sewer line under house”.
Compiled from City of Austin records · updated Aug 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 21, 2025
- since Aug 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledP&b 17 sewer line under house
- AppliedAug 18, 2025
- IssuedAug 21, 2025
- WorkAug '25 – Jan '26
- Final inspectionJan 29, 2026
Passed final inspection Jan 29, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectP&b 17 sewer line under house
P&b 17 sewer line under house
City of Austin permitPlumbing PermitFinal- Record
- 2025-104351 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 109 W 55th Half St
What is being built at 109 W 55th Half St?
The latest filing (City of Austin permit 2025-104351 PP, August 21, 2025) covers p&b 17 sewer line under house.
How many permits and filings does 109 W 55th Half St have?
1 filing across 1 project, from August 21, 2025 to August 21, 2025.
Is there other construction near 109 W 55th Half St?
Yes. Nearby filings include 108 W 55th Half St (interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck, Sep 9, 2024); 110 W 55th St (replace 50 of sewer yard line, Jul 12, 2024); 104 W 55th St (express - replace three existing old windows by installing three new size for size replacement windows, May 18, 2026).
How do I get alerts for new permits at 109 W 55th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 108 W 55th Half StSep 9, 2024Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck · 45 m away
- 110 W 55th StJul 12, 2024Replace 50 of sewer yard line · 56 m away
- 104 W 55th StMay 18, 2026Express - replace three existing old windows by installing three new size for size replacement windows · 60 m away
- 102 W 55th Half StFeb 5, 2025Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base · 61 m away
- 202 W 55th Half StMay 15, 2025Addition of second story to existing sfr · 73 m away
- 100 W 55th Half StDec 21, 2023Installation of roof-mounted solar array system and solar battery · 75 m away
- 205 W 55th Half StMar 18, 2025Install new 8.28kw rooftop solar system to existing residential only · 78 m away
- 202 W 55th StSep 16, 2025New construction of detached 2-story accessory structure 1.5 bath · 81 m away
- 111 W 55th StOct 9, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 105 W 55th StJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 113 W 55th StMay 14, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 206 W 55th Half StMar 4, 2024Removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan · 103 m away