groundranger
Historic · latest filing Mar 2025Residential

205 W 55th Half St

Austin, TX 78751

205 W 55th Half St: 1 project on record

City of Austin lists 1 filing across 1 project at 205 W 55th Half St, Austin, TX 78751. The most recent, filed March 18, 2025, covers: “Install new 8.28kw rooftop solar system to existing residential only”.

Compiled from City of Austin records · updated Mar 18, 2025

Projects
1
1 filings
Latest filing
Mar 18, 2025
since Mar 18, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 8.28kw rooftop solar system to existing residential only

  1. AppliedMar 13, 2025
  2. IssuedMar 18, 2025
  3. WorkMar '25 – Oct '25
  4. Final inspectionJun 12, 2025

Passed final inspection Jun 12, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install new 8.28kw rooftop solar system to existing residential only

    Install new 8.28kw rooftop solar system to existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 205 W 55th Half St

What is being built at 205 W 55th Half St?

The latest filing (City of Austin permit 2025-030487 EP, March 18, 2025) covers install new 8.28kw rooftop solar system to existing residential only.

How many permits and filings does 205 W 55th Half St have?

1 filing across 1 project, from March 18, 2025 to March 18, 2025.

Is there other construction near 205 W 55th Half St?

Yes. Nearby filings include 209 W 55th Half St (interior remodel of sfr, Mar 31, 2025); 202 W 55th Half St (addition of second story to existing sfr, May 15, 2025); 206 W 55th Half St (removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan, Mar 4, 2024).

How do I get alerts for new permits at 205 W 55th Half St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78751

More solar installs in 78751.

Email me when a new permit is filed