5710 Guadalupe St
Austin, TX 78752 · State Of Texas
Restroom renovation registered at DPS Building L
A renovation of about 1,380 square feet of existing restrooms is planned at DPS Building L, 5710 Guadalupe St. The project was registered with TDLR on March 31, 2026, with an estimated project cost of $350,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 31, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 31, 2026
- since Mar 31, 2026
- Largest scope
- 1,380 sf
- Estimated cost
- $350K
- state registration
Where this project stands
Under constructionDPS Building L Restroom Renovation
1,380 sq ft · $350K est.
- RegisteredMar 31, 2026
- Plan review
- ConstructionMay '26 – Aug '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovating roughly 1,380sf of existing restrooms spaces within the dps facility. — dps building l
TDLR project registrationRenovation/AlterationReview Complete1,380 sq ft$350K est.- Project #
- TABS2026016405
- Tenant / owner
- Dps Building L Restroom Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5710 Guadalupe St
What is being built at 5710 Guadalupe St?
The project is a renovation of about 1,380 square feet of existing restrooms inside DPS Building L. The TDLR registration does not describe new construction.
When was the DPS Building L restroom renovation registered?
The project was registered on March 31, 2026. Its TDLR project number is TABS2026016405.
How much will the DPS Building L restroom renovation cost?
The TDLR registration lists an estimated project cost of $350,000. This is the applicant's estimate for the project.
How large is the restroom renovation at 5710 Guadalupe St?
The registration describes work on roughly 1,380 square feet of existing restroom space.
Has the DPS Building L renovation been approved?
The TDLR record lists the project status as “Review Complete.” The record does not provide a construction start date.
Also being built nearby
All of 78752- 5706 Chesterfield AveOct 22, 2026Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 5718 Chesterfield AveFeb 23, 2026Replacement of complete existing central heat and air system with or without duct work · 170 m away
- 404 W 55th Half StJun 22, 2026New detached 2 car garage · 176 m away
- 5707 Chesterfield AveJan 21, 2026Rebuild service. meter base and riser · 192 m away
- 5802 Chesterfield AveMay 19, 2026Replacement of an existing water heater tankless water heater swap (like for like) · 238 m away
- 5714 Avenue DNov 25, 2024Express: change windows replace like for like · 245 m away
- 5703 Avenue CMar 12, 2025Replacement of an existing water heater replaced tankless water heater · 245 m away
- 5804 Chesterfield AveAug 12, 2025Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time · 252 m away
- 303 W 55th Half StJul 17, 2026Replacement of complete existing central heat and air system with or without duct work · 255 m away
- 211 W Koenig LnJul 10, 2024Monument for koenig homes · 263 m away
- 301 W 55th Half StAug 25, 2025Replacement of an existing water heater remove and replace water heater - 40 gal gas · 266 m away
- 5702 Avenue DDec 3, 2024Sewer line-repair/replacement · 273 m away