12003 Oakwood Dr
Austin, TX 78753
Central heating and air system replacement in Austin
A complete existing central heating and air system is being replaced at 12003 Oakwood Dr, with or without duct work. The City of Austin issued active mechanical permit 2026-117085 MP on September 10, 2026.
Summarized from City of Austin records · updated Sep 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2026
- since Sep 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 6, 2026
- IssuedSep 10, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-117085 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12003 Oakwood Dr
What is being built at 12003 Oakwood Dr?
The permit covers replacement of the existing central heat and air system, with or without duct work. It does not describe a new building.
Is a new home being built at 12003 Oakwood Dr?
The City of Austin record describes a central heating and air system replacement, not new home construction. The permit is 2026-117085 MP, dated September 10, 2026.
When was the HVAC permit issued for 12003 Oakwood Dr?
The City of Austin permit is dated September 10, 2026.
What does permit 2026-117085 MP cover?
It covers replacement of the complete existing central heat and air system, with or without duct work.
Is the permit for a new HVAC system at 12003 Oakwood Dr?
The permit description says the existing central heat and air system is being replaced. The City of Austin lists the mechanical permit as active.
Also being built nearby
All of 78753- 11906 Indianhead DrAug 3, 2026Create entry tunnel(s) to replace all cast iron drain system up to bottom of foundation and out to exterior cleanout. approx 50ft of tunnel · 109 m away
- 11905 Oakwood DrApr 20, 2026Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 11903 Indianhead DrMay 19, 2025Service disconnect and relocation to main panel with a 200amp meter can replacement overhead and grounding · 127 m away
- 11904 Indianhead DrDec 20, 202314 drain yardline repair peir beam replacement & 20drain repipe · 128 m away
- 11903 Oakwood DrJul 29, 202475 tunnel below the foundation to replace drain system. 3 access holes - 2 in back and 1 in front · 142 m away
- 700 Wren AveJun 27, 2024Express: replace 16 windows like for like · 143 m away
- 11902 Indianhead DrFeb 29, 2024Tunnel below the foundation to repair drain lines · 158 m away
- 11905 Pollyanna AveAug 12, 2024-build overhead service with metallic riser 200 amp meter and 125 amp main breaker panel. -locate this new service on side of home as opposed to back of home where existing service is located (new location is closer to utility pole) -install grounding system -install whole home surge protection -replace subpanel -install duel function protection for existing ungrounded branch circuits -relocate branch circuits at exterior panel to be moved · 175 m away
- 12012 IH 35 SvrdNov 9, 2017John king construction · 188 m away
- 704 Wren AveJul 8, 2026Total demolition of sfr 3735 sq ft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition · 190 m away
- 11809 Oakwood DrApr 27, 2025Replace waterline from house to meter · 192 m away
- 11816 Indianhead DrMar 3, 2025Express: 11 windows and 2 doors · 211 m away