12012 IH 35 Svrd
Austin, TX 78753
12012 IH 35 Svrd: 1 project on record
City of Austin lists 1 filing across 1 project at 12012 IH 35 Svrd, Austin, TX 78753. The most recent, filed November 9, 2017, covers: “John king construction”.
Compiled from City of Austin records · updated Nov 9, 2017
- Projects
- 1
- 1 filings
- Latest filing
- Nov 9, 2017
- since Nov 9, 2017
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 12012 IH 35 Svrd
What is being built at 12012 IH 35 Svrd?
The latest filing (City of Austin case 245613, November 9, 2017) covers john king construction.
How many permits and filings does 12012 IH 35 Svrd have?
1 filing across 1 project, from November 9, 2017 to November 9, 2017.
Is there other construction near 12012 IH 35 Svrd?
Yes. Nearby filings include 704 Wren Ave (total demolition of sfr 3735 sq ft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition, Jul 8, 2026); 700 Wren Ave (express: replace 16 windows like for like, Jun 27, 2024); 12004 North Oaks Dr (upgrading a home service from an existing 100a service to a new 200 amp service, Jul 18, 2025).
How do I get alerts for new permits at 12012 IH 35 Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 704 Wren AveJul 8, 2026Total demolition of sfr 3735 sq ft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition · 45 m away
- 700 Wren AveJun 27, 2024Express: replace 16 windows like for like · 82 m away
- 12004 North Oaks DrJul 18, 2025Upgrading a home service from an existing 100a service to a new 200 amp service · 156 m away
- 12010 North Oaks DrMar 11, 2026Replacement of complete existing central heat and air system with or without duct work · 165 m away
- 11905 Pollyanna AveAug 12, 2024-build overhead service with metallic riser 200 amp meter and 125 amp main breaker panel. -locate this new service on side of home as opposed to back of home where existing service is located (new location is closer to utility pole) -install grounding system -install whole home surge protection -replace subpanel -install duel function protection for existing ungrounded branch circuits -relocate branch circuits at exterior panel to be moved · 174 m away
- 12003 Oakwood DrSep 10, 2026Replacement of complete existing central heat and air system with or without duct work · 188 m away
- 12005 North Oaks DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work install installing 3 ton goodman two stage gas upflow system. -outdoor portion will need a pad disconnect and whip. -indoor portion will need a filter base and honeywell thermostat. -installing remi halo led · 209 m away
- 12001 North Oaks DrDec 18, 2024Express: replace 10 windows like for like · 223 m away
- 11901 Pollyanna AveOct 29, 2025Amnesty co for home circa 1954 · 226 m away
- 12009-1/2 IH 35 SvrdJun 23, 2014Springs of walnut creek - phase 3 · 240 m away
- 11911 North Oaks DrSep 5, 2025We are abandoning the septic tank and connecting the customer to city sewer line · 241 m away
- 11902 North Oaks DrJul 28, 2025Adding 25 amps for power for sauna 7x4x6 · 245 m away