12004 North Oaks Dr
Austin, TX 78753
Plumbing and electrical upgrades at an existing home
City of Austin permits indicate plumbing and electrical upgrades to an existing home at 12004 North Oaks Dr, rather than construction of a new building. The work was permitted between March 4, 2024, and July 18, 2025, including drain and water-line replacements and an upgrade from 100-amp to 200-amp electrical service.
Summarized from City of Austin records · updated Jul 18, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jul 18, 2025
- since Mar 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrading a home service from an existing 100a service to a new 200 amp service
- AppliedJul 9, 2025
- IssuedJul 18, 2025
- WorkJul '25 – Aug '25
- Final inspectionSep 5, 2025
Passed final inspection Sep 5, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsUpgrading a home service from an existing 100a service to a new 200 amp service
Upgrading a home service from an existing 100a service to a new 200 amp service
City of Austin permitElectrical PermitFinal- Record
- 2025-084862 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Kinsey will be excavating up to 58 ft of main water service from the city tap to the home installing a new pex water line with prv and a new shut off and tracer wire. we will continue the new water line up into the home and do a whole home water repipe. hot and cold including a new water heater install navien npe 240 a2
Kinsey will be excavating up to 58 ft of main water service from the city tap to the home installing a new pex water line with prv and a new shut off and tracer wire. we will continue the new water line up into the home and do a whole home water repipe. hot and cold including a new water heater install navien npe 240 a2
City of Austin permitPlumbing PermitFinal- Record
- 2024-062656 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Kinsey will excavate tunnel starting from left side of house between bathrooms to kitchen wall. trench along left side of house to the front of yard where city tap is located. we will remove all cast iron under slab install new schedule 40 pvc in its place. pipe will be hung every 6 ft by clevis hangers. engineer will come by to do a report on tunnel and verify backfill method. city permit will be pulled and inspection is scheduled once plumbing is finished. backfill will follow green tag
Kinsey will excavate tunnel starting from left side of house between bathrooms to kitchen wall. trench along left side of house to the front of yard where city tap is located. we will remove all cast iron under slab install new schedule 40 pvc in its place. pipe will be hung every 6 ft by clevis hangers. engineer will come by to do a report on tunnel and verify backfill method. city permit will be pulled and inspection is scheduled once plumbing is finished. backfill will follow green tag
City of Austin permitPlumbing PermitFinal- Record
- 2024-025263 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12004 North Oaks Dr
What is being built at 12004 North Oaks Dr?
The City of Austin permits describe upgrades to an existing home, not a new building. The work includes plumbing replacements and an electrical service upgrade.
Is a restaurant opening at 12004 North Oaks Dr?
The available permit descriptions do not indicate a restaurant opening. They describe plumbing and electrical work at a home.
What plumbing work was permitted at 12004 North Oaks Dr?
Permit 2024-025263 PP, filed March 4, 2024, covers replacement of cast-iron drain piping under the home. Permit 2024-062656 PP, filed May 20, 2024, covers a new water line, a whole-home repipe, and a water heater installation.
Was the electrical service upgraded at 12004 North Oaks Dr?
Yes. Electrical permit 2025-084862 EP, filed July 18, 2025, describes upgrading the home's service from 100 amps to 200 amps.
When were permits filed for work at 12004 North Oaks Dr?
The three City of Austin permits were filed March 4, 2024, May 20, 2024, and July 18, 2025. All three are listed as final.
Also being built nearby
All of 78753- 12005 North Oaks DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work install installing 3 ton goodman two stage gas upflow system. -outdoor portion will need a pad disconnect and whip. -indoor portion will need a filter base and honeywell thermostat. -installing remi halo led · 54 m away
- 12001 North Oaks DrDec 18, 2024Express: replace 10 windows like for like · 76 m away
- 12010 North Oaks DrMar 11, 2026Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 11911 North Oaks DrSep 5, 2025We are abandoning the septic tank and connecting the customer to city sewer line · 109 m away
- 12000 Oak TrlJan 12, 20269.66kw residential rooftop solar installation · 111 m away
- 11908 Oak TrlOct 14, 2026Base: installing a backup battery system and additional meter socket · 136 m away
- 11906 Oak TrlNov 3, 2025Replacement of complete existing central heat and air system with or without duct work · 153 m away
- 12012 IH 35 SvrdNov 9, 2017John king construction · 156 m away
- 11905 North Oaks DrApr 18, 2025Replacement of an existing water heater · 156 m away
- 11902 North Oaks DrJul 28, 2025Adding 25 amps for power for sauna 7x4x6 · 167 m away
- 11904 Oak TrlApr 17, 2025Due to gas being shut off. we tested and brought the property up to code as needed. water heater and smoked detectors · 173 m away
- 11903 North Oaks DrJun 6, 2026Install tesla wall charger · 175 m away
More restaurants in 78753.