12010 North Oaks Dr
Austin, TX 78753
Central heating and air system replacement permitted
Austin permit records indicate a replacement of the complete existing central heating and air system at 12010 North Oaks Dr. The mechanical permit was issued on March 11, 2026, and its status is listed as final.
Summarized from City of Austin records · updated Mar 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 11, 2026
- since Mar 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMar 10, 2026
- IssuedMar 11, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 24, 2026
Passed final inspection Mar 24, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-028931 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12010 North Oaks Dr
What work is being done at 12010 North Oaks Dr?
A City of Austin mechanical permit covers replacement of the complete existing central heat and air system, with or without duct work.
When was the permit for 12010 North Oaks Dr filed?
The permit was filed on March 11, 2026.
What is the permit number for 12010 North Oaks Dr?
The City of Austin permit number is 2026-028931 MP.
Is a new home being built at 12010 North Oaks Dr?
The available permit record describes replacement of an existing central heating and air system, not new home construction.
Is the heating and air permit at 12010 North Oaks Dr final?
Yes. The City of Austin record lists permit 2026-028931 MP as final.
Also being built nearby
All of 78753- 12004 North Oaks DrJul 18, 2025Upgrading a home service from an existing 100a service to a new 200 amp service · 80 m away
- 12005 North Oaks DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work install installing 3 ton goodman two stage gas upflow system. -outdoor portion will need a pad disconnect and whip. -indoor portion will need a filter base and honeywell thermostat. -installing remi halo led · 93 m away
- 806 Walnut Creek DrFeb 27, 2025Express: replacing 2 windows like for like · 127 m away
- 12009-1/2 IH 35 SvrdJun 23, 2014Springs of walnut creek - phase 3 · 132 m away
- 12001 North Oaks DrDec 18, 2024Express: replace 10 windows like for like · 141 m away
- 12000 Oak TrlJan 12, 20269.66kw residential rooftop solar installation · 163 m away
- 12012 IH 35 SvrdNov 9, 2017John king construction · 165 m away
- 704 Wren AveJul 8, 2026Total demolition of sfr 3735 sq ft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition · 170 m away
- 11911 North Oaks DrSep 5, 2025We are abandoning the septic tank and connecting the customer to city sewer line · 181 m away
- 11908 Oak TrlOct 14, 2026Base: installing a backup battery system and additional meter socket · 198 m away
- 11906 Oak TrlNov 3, 2025Replacement of complete existing central heat and air system with or without duct work · 219 m away
- 700 Wren AveJun 27, 2024Express: replace 16 windows like for like · 226 m away