700 Wren Ave
Austin, TX 78753
700 Wren Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 700 Wren Ave, Austin, TX 78753. The most recent, filed June 27, 2024, covers: “Express: replace 16 windows like for like”.
Compiled from City of Austin records · updated Jun 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2024
- since Jun 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace 16 windows like for like
- AppliedJun 20, 2024
- IssuedJun 27, 2024
- WorkJun '24 – Aug '24
- Final inspectionAug 7, 2024
Passed final inspection Aug 7, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: replace 16 windows like for like
Express: replace 16 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2024-080859 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 700 Wren Ave
What is being built at 700 Wren Ave?
The latest filing (City of Austin permit 2024-080859 BP, June 27, 2024) covers express: replace 16 windows like for like.
How many permits and filings does 700 Wren Ave have?
1 filing across 1 project, from June 27, 2024 to June 27, 2024.
Is there other construction near 700 Wren Ave?
Yes. Nearby filings include 704 Wren Ave (total demolition of sfr 3735 sq ft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition, Jul 8, 2026); 12012 IH 35 Svrd (john king construction, Nov 9, 2017); 12003 Oakwood Dr (replacement of complete existing central heat and air system with or without duct work, Sep 10, 2026).
How do I get alerts for new permits at 700 Wren Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 704 Wren AveJul 8, 2026Total demolition of sfr 3735 sq ft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition · 56 m away
- 12012 IH 35 SvrdNov 9, 2017John king construction · 82 m away
- 12003 Oakwood DrSep 10, 2026Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 11905 Pollyanna AveAug 12, 2024-build overhead service with metallic riser 200 amp meter and 125 amp main breaker panel. -locate this new service on side of home as opposed to back of home where existing service is located (new location is closer to utility pole) -install grounding system -install whole home surge protection -replace subpanel -install duel function protection for existing ungrounded branch circuits -relocate branch circuits at exterior panel to be moved · 209 m away
- 12012 Park Thirty Five CirSep 3, 2026Replacement of an existing water heater · 224 m away
- 12010 North Oaks DrMar 11, 2026Replacement of complete existing central heat and air system with or without duct work · 226 m away
- 12004 North Oaks DrJul 18, 2025Upgrading a home service from an existing 100a service to a new 200 amp service · 234 m away
- 11906 Indianhead DrAug 3, 2026Create entry tunnel(s) to replace all cast iron drain system up to bottom of foundation and out to exterior cleanout. approx 50ft of tunnel · 243 m away
- 11905 Oakwood DrApr 20, 2026Replacement of complete existing central heat and air system with or without duct work · 245 m away
- 12009-1/2 IH 35 SvrdJun 23, 2014Springs of walnut creek - phase 3 · 263 m away
- 11904 Indianhead DrDec 20, 202314 drain yardline repair peir beam replacement & 20drain repipe · 264 m away
- 11901 Pollyanna AveOct 29, 2025Amnesty co for home circa 1954 · 264 m away