100-foot tunnel for sewer line work permitted in Austin
A 100-foot tunnel for sewer line repair or replacement was permitted at 8302 Shenandoah Dr in Austin. The City of Austin issued plumbing permit 2025-132479 PP on October 17, 2025; its status is Final.
Summarized from City of Austin records · updated Oct 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 17, 2025
- since Oct 17, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWe are doing a 100ft tunnel to repair or replace sewer line
- AppliedOct 13, 2025
- IssuedOct 17, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 24, 2025
Passed final inspection Nov 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectWe are doing a 100ft tunnel to repair or replace sewer line
We are doing a 100ft tunnel to repair or replace sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2025-132479 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8302 Shenandoah Dr
What is being built at 8302 Shenandoah Dr?
A City of Austin plumbing permit describes a 100-foot tunnel to repair or replace a sewer line. The record does not specify which option was carried out.
When was the sewer line work permitted?
The City of Austin permit was filed on October 17, 2025.
What is the permit number for 8302 Shenandoah Dr?
The permit number is 2025-132479 PP. It is listed as a plumbing permit.
What is the status of the sewer line permit?
The City of Austin lists permit 2025-132479 PP as Final.
How long is the tunnel for the sewer line work?
The permit description specifies a 100-foot tunnel.
Also being built nearby
All of 78753- 8300 Shenandoah DrSep 22, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system through austin energys weatherization assistance program · 32 m away
- 8303 Grayledge DrMar 11, 2026Express: partial reroof. material change (asphalt shingles to metal) and 1850 sq ft redeck revision: full re-roof instead of partial re-roof · 45 m away
- 8303 Shenandoah DrMar 18, 2024Tee into external gas line and run additional line for generator installation · 47 m away
- 8213 Shenandoah DrMay 27, 2026Replacement of complete existing central heat and air system with or without duct work inman · 75 m away
- 903 Valley Forge DrAug 5, 2026Per tx gas we need to relocate the gas meter away from the ac window opening and electrical while they repair and replace a main line thats leaking on there side · 84 m away
- 8206 Shenandoah DrJan 4, 2026Putting an above ground pre-manufactured swim spa in the backyard on grade and connecting it to the existing electrical service. (deeper than 24 inches) · 107 m away
- 8310 Loralinda DrJan 27, 2025Express: replace tub to shower replace kitchen faucet replace master bath and half bath toilets (not relocate) replace the faucet and sink in hall bath · 108 m away
- 8209 Shenandoah DrJun 15, 2026Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 8211 Grayledge DrNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 8403 Shenandoah DrJun 16, 2026Express- tub to shower replacement (prefab base) in the same location without relocating plumbing · 131 m away
- 8309 Loralinda DrMar 12, 2024Install 13.5 energy storage system for existing residential only · 143 m away
- 8210 Loralinda DrMar 7, 2025Upgrading existing service to 200 amps · 144 m away