Gas meter relocation and main-line repair at 903 Valley Forge Dr
A City of Austin plumbing permit indicates gas-meter relocation and repair or replacement of a leaking main line at 903 Valley Forge Dr. The permit was filed August 5, 2026, and its status is listed as Final.
Summarized from City of Austin records · updated Aug 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2026
- since Aug 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPer tx gas we need to relocate the gas meter away from the ac window opening and electrical while they repair and replace a main line thats leaking on there side
- AppliedAug 5, 2026
- IssuedAug 5, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 7, 2026
Passed final inspection Aug 7, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectPer tx gas we need to relocate the gas meter away from the ac window opening and electrical while they repair and replace a main line thats leaking on there side
Per tx gas we need to relocate the gas meter away from the ac window opening and electrical while they repair and replace a main line thats leaking on there side
City of Austin permitPlumbing PermitFinal- Record
- 2026-101407 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 903 Valley Forge Dr
What work is permitted at 903 Valley Forge Dr?
A plumbing permit describes relocating the gas meter away from an AC window opening and electrical equipment while repairing or replacing a leaking main line.
When was the permit for 903 Valley Forge Dr filed?
The City of Austin permit, number 2026-101407 PP, was filed on August 5, 2026.
Is the 903 Valley Forge Dr permit approved?
The City of Austin record lists permit 2026-101407 PP as Final.
Is a new building going up at 903 Valley Forge Dr?
The available record is for a plumbing permit describing gas-meter relocation and main-line repair or replacement; it does not describe new building construction.
What is the gas-line work at 903 Valley Forge Dr for?
The permit description says the main line is leaking and the gas meter needs to be moved away from an AC window opening and electrical equipment.
Also being built nearby
All of 78753- 8206 Shenandoah DrJan 4, 2026Putting an above ground pre-manufactured swim spa in the backyard on grade and connecting it to the existing electrical service. (deeper than 24 inches) · 43 m away
- 8211 Grayledge DrNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 8300 Shenandoah DrSep 22, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system through austin energys weatherization assistance program · 55 m away
- 8213 Shenandoah DrMay 27, 2026Replacement of complete existing central heat and air system with or without duct work inman · 78 m away
- 8209 Shenandoah DrJun 15, 2026Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 8303 Grayledge DrMar 11, 2026Express: partial reroof. material change (asphalt shingles to metal) and 1850 sq ft redeck revision: full re-roof instead of partial re-roof · 83 m away
- 8302 Shenandoah DrOct 17, 2025We are doing a 100ft tunnel to repair or replace sewer line · 84 m away
- 8208 Grayledge DrMar 27, 2026I will be replacing the electrical meter can and riser at the address at 8208 gray ledge dr. austin tx 78753. enclosed is the espa · 100 m away
- 8303 Shenandoah DrMar 18, 2024Tee into external gas line and run additional line for generator installation · 106 m away
- 829 Valley Forge DrJun 13, 2024Excavate 102 to repair main drain line under home · 110 m away
- 8210 Loralinda DrMar 7, 2025Upgrading existing service to 200 amps · 139 m away
- 8211 Loralinda DrMay 21, 2026Replacement of an existing water heater 50gal gas tank · 172 m away