10013 Baden Ln
Austin, TX 78754
Central heating and air system replacement at 10013 Baden Ln
A City of Austin mechanical permit dated August 10, 2026, covers replacement of the existing central heating and air system at 10013 Baden Ln, with or without ductwork. The permit is marked final.
Summarized from City of Austin records · updated Aug 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 10, 2026
- since Aug 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 3, 2026
- IssuedAug 10, 2026
- WorkAug '26 – Nov '26
- Final inspectionNov 13, 2026
Passed final inspection Nov 13, 2026.
1 contact on this project
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-100587 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10013 Baden Ln
What is happening at 10013 Baden Ln in Austin?
A City of Austin mechanical permit covers replacing the existing central heating and air system, with or without ductwork. The permit is dated August 10, 2026.
Is a new house being built at 10013 Baden Ln?
The available permit is for replacing an existing central heating and air system, not for new home construction.
When was the HVAC permit for 10013 Baden Ln filed?
The City of Austin permit, 2026-100587 MP, is dated August 10, 2026.
What does permit 2026-100587 MP cover?
It covers replacement of the complete existing central heating and air system, with or without ductwork. The permit status is final.
Is the permit for 10013 Baden Ln final?
Yes. The City of Austin lists mechanical permit 2026-100587 MP as final.
Also being built nearby
All of 78754- 10110 Baden LnOct 6, 2015Pioneer hill amenity center · 95 m away
- 2011 Arborside DrSep 14, 2026Installing ductwork on a microwave exhaust and running it to an exterior wall vent · 103 m away
- 2002 Arborside DrOct 28, 2025Install ev car charger · 146 m away
- 2101 Daleside LnAug 28, 2024Install new 5.52kw rooftop solar system for existing residential only · 216 m away
- 2105 Daleside LnApr 4, 2024Install new 5.460kw rooftop solar system for existing residential only · 222 m away
- 10305 Tildon AveSep 18, 2026Ph2 install new 3.045 kw rooftop solar system for existing residential only · 241 m away
- 2102 Arborside DrDec 18, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <75 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant · 253 m away
- 2109 Arborside DrJan 22, 2024Install 12 (385w) roof mounted solar panels 4.620 kw solar service system tying into existing 200 amp rated main service panel · 256 m away
- 1710 Arborside DrFeb 13, 2024Replacement of an existing water heater · 275 m away
- 1625 Edgeworth BndJul 1, 2020Pioneer hill apartments phase 1 · 276 m away
- 9716 Baden LnJan 17, 2024Patio enclosure and roof extension to cover rolling in expired permit #2022-104272 ep · 288 m away
- 10200 Tildon AveOct 20, 2025Express: foundation repair · 301 m away