groundranger
Active · latest filing Sep 2026Residential

2011 Arborside Dr

Austin, TX 78754

Microwave exhaust ductwork permitted at 2011 Arborside Dr

A City of Austin mechanical permit filed September 14, 2026, covers installing ductwork for a microwave exhaust and routing it to an exterior wall vent. A separate electrical permit for a Level 2 EV charger was filed October 10, 2024; both permits are listed as final.

Summarized from City of Austin records · updated Sep 14, 2026

Projects
2
2 filings
Latest filing
Sep 14, 2026
since Oct 10, 2024
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Installing ductwork on a microwave exhaust and running it to an exterior wall vent

    Installing ductwork on a microwave exhaust and running it to an exterior wall vent

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install level 2 ev charger

    Install level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2011 Arborside Dr

What is being built at 2011 Arborside Dr?

City of Austin records show home improvement permits for microwave exhaust ductwork and a Level 2 EV charger, not a new building. The mechanical permit is 2026-117840 MP.

What is the 2026 permit for at 2011 Arborside Dr?

Permit 2026-117840 MP covers ductwork for a microwave exhaust, routed to an exterior wall vent. It was filed September 14, 2026, and is listed as final.

Is a new restaurant opening at 2011 Arborside Dr?

The records provided do not indicate a restaurant opening. The 2026 permit covers microwave exhaust ductwork.

Was an EV charger permitted at 2011 Arborside Dr?

Yes. City of Austin electrical permit 2024-135604 EP covers installation of a Level 2 EV charger. It was filed October 10, 2024, and is listed as final.

When were permits filed for 2011 Arborside Dr?

The listed permits were filed October 10, 2024, for a Level 2 EV charger, and September 14, 2026, for microwave exhaust ductwork. Both are listed as final.

Also being built nearby

All of 78754
Get alerts for 2011 Arborside Dr