groundranger
Active · latest filing Sep 2026Residential

10305 Tildon Ave

Austin, TX 78754

3.045-kW rooftop solar system permitted at 10305 Tildon Ave

A 3.045-kW rooftop solar system is planned for an existing residence at 10305 Tildon Ave. The City of Austin issued an active electrical permit for the installation on September 18, 2026 (permit 2024-084967 EP).

Summarized from City of Austin records · updated Sep 18, 2026

Projects
1
1 filings
Latest filing
Sep 18, 2026
since Sep 18, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Ph2 install new 3.045 kw rooftop solar system for existing residential only

  1. AppliedJul 9, 2024
  2. IssuedSep 18, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
34% through of the permit windowSep 18, 2026 → Mar 17, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Ph2 install new 3.045 kw rooftop solar system for existing residential only

    Ph2 install new 3.045 kw rooftop solar system for existing residential only

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10305 Tildon Ave

What is being built at 10305 Tildon Ave?

A 3.045-kW rooftop solar system is planned for an existing residence, according to City of Austin permit 2024-084967 EP.

When was the solar permit filed at 10305 Tildon Ave?

The City of Austin permit is dated September 18, 2026.

Is 10305 Tildon Ave a new home construction project?

No new home construction is listed. The permit describes a solar installation for an existing residence.

What size solar system is planned at 10305 Tildon Ave?

The permit description specifies a 3.045-kW rooftop solar system.

Is the solar installation permit for 10305 Tildon Ave active?

Yes. The City of Austin lists the electrical permit as active, with a date of September 18, 2026.

Also being built nearby

All of 78754

More solar installs in 78754.

Email me when it passes final inspection