1100 Koenig Ln
Austin, TX 78757
Mixed-use development site plan approved on Koenig Lane
A mixed-use development is planned at 1100 Koenig Lane. The City of Austin approved and released its site plan on July 23, 2025, under case 13181826.
Summarized from City of Austin records · updated Jul 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 23, 2025
- since Jul 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1100 Koenig Ln
What is being built at 1100 Koenig Lane?
A City of Austin case describes a mixed-use development at the address. Its site plan was approved and released on July 23, 2025.
What is the status of the Koenig mixed-use development?
The City of Austin case lists the site plan as approved and released. The case number is 13181826.
When was the site plan for 1100 Koenig Lane approved?
The City of Austin record is dated July 23, 2025, and lists the site plan as approved and released.
How large is the development at 1100 Koenig Lane?
The available City of Austin record does not provide a square-footage figure.
Who is developing 1100 Koenig Lane?
The City of Austin record does not identify an owner or developer.
Also being built nearby
All of 78757- 5908 Aurora DrFeb 16, 2011The mediterranean chef · 41 m away
- 1112 Koenig LnSep 25, 2026Valero convenience store addition-remodeling site plan · 85 m away
- 5905 Grover AveOct 1, 2025***timed in-person inspection: 10/28/2025 @ 1 pm*** replacement of complete existing central heat and air system with or without duct work · 100 m away
- 5907 Grover AveFeb 6, 2026We will remove old cast-iron pipe and hang new pvc pipe with proper fall anchored with hangers into the concrete slab. we will be tunneling 48 feet. install 55 feet of new pvc pipe replacing rotted-out cast iron · 101 m away
- 5911 Sunshine DrJun 27, 202560 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left · 149 m away
- 6000 Grover AveFeb 29, 2024New service overhead including two-200 amp breaker panels jbox for ae. property is duplex a and b · 148 m away
- 1200 Koenig LnDec 4, 2024June west multifamily · 154 m away
- 1200 W Koenig LnSep 4, 2024100% smart housing-trash enclosure · 154 m away
- 905 Old Koenig LnApr 22, 2009Rebuild of koenig lane substation · 155 m away
- 6009 Grover AveJul 15, 2026Replace existing cast-iron sanitary sewer piping beneath the residence via tunneling. also replace approximately 10 feet of sewer piping to correct an existing belly · 156 m away
- 908 Old Koenig LnMar 3, 2025Kinsey will be excavating up to 130ft of main sewer line from building to city tap and installing new 4 schedule 40 pvc in its place with sand bed and two new cleanouts · 159 m away
- 1203 Palo Duro RdJan 22, 2024Install evse at garage · 160 m away