5908 Aurora Dr
Austin, TX 78757
5908 Aurora Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5908 Aurora Dr, Austin, TX 78757. The most recent, filed February 16, 2011, covers: “The mediterranean chef”.
Compiled from City of Austin records · updated Feb 16, 2011
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2011
- since Feb 16, 2011
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5908 Aurora Dr
What is being built at 5908 Aurora Dr?
The latest filing (City of Austin case 10512823, February 16, 2011) covers the mediterranean chef.
How many permits and filings does 5908 Aurora Dr have?
1 filing across 1 project, from February 16, 2011 to February 16, 2011.
Is there other construction near 5908 Aurora Dr?
Yes. Nearby filings include 1100 Koenig Ln (koenig mixed use development, Jul 23, 2025); 5907 Grover Ave (we will remove old cast-iron pipe and hang new pvc pipe with proper fall anchored with hangers into the concrete slab. we will be tunneling 48 feet. install 55 feet of new pvc pipe replacing rotted-out cast iron, Feb 6, 2026); 5905 Grover Ave (***timed in-person inspection: 10/28/2025 @ 1 pm*** replacement of complete existing central heat and air system with or without duct work, Oct 1, 2025).
How do I get alerts for new permits at 5908 Aurora Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1100 Koenig LnJul 23, 2025Koenig mixed use development · 41 m away
- 5907 Grover AveFeb 6, 2026We will remove old cast-iron pipe and hang new pvc pipe with proper fall anchored with hangers into the concrete slab. we will be tunneling 48 feet. install 55 feet of new pvc pipe replacing rotted-out cast iron · 86 m away
- 5905 Grover AveOct 1, 2025***timed in-person inspection: 10/28/2025 @ 1 pm*** replacement of complete existing central heat and air system with or without duct work · 93 m away
- 1112 Koenig LnSep 25, 2026Valero convenience store addition-remodeling site plan · 93 m away
- 6009 Grover AveJul 15, 2026Replace existing cast-iron sanitary sewer piping beneath the residence via tunneling. also replace approximately 10 feet of sewer piping to correct an existing belly · 117 m away
- 6000 Grover AveFeb 29, 2024New service overhead including two-200 amp breaker panels jbox for ae. property is duplex a and b · 122 m away
- 6011 Grover AveMay 30, 2024Installation of irrigation system · 132 m away
- 5911 Sunshine DrJun 27, 202560 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left · 133 m away
- 6003 Aurora DrAug 8, 2025Install senville leto series mini split air conditioner heat pump 9000 btu 110/120v · 134 m away
- 1201 Alguno RdNov 4, 2025Addition of an interior stairwell providing access to the bedroom and bathroom above the existing attached garage to the living room on the 1st floor of the single family residence · 139 m away
- 1203 Alguno RdMar 23, 2026Construct new driveway approach of 11 ft. no sidewalk inspection per plan review · 150 m away
- 1203 Palo Duro RdJan 22, 2024Install evse at garage · 151 m away