5911 Sunshine Dr
Austin, TX 78757
5911 Sunshine Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5911 Sunshine Dr, Austin, TX 78757. The most recent, filed June 27, 2025, covers: “60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left”.
Compiled from City of Austin records · updated Jun 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2025
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left
- AppliedJun 24, 2025
- IssuedJun 27, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 11, 2025
Passed final inspection Jul 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left
60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left
City of Austin permitPlumbing PermitFinal- Record
- 2025-078295 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5911 Sunshine Dr
What is being built at 5911 Sunshine Dr?
The latest filing (City of Austin permit 2025-078295 PP, June 27, 2025) covers 60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left.
How many permits and filings does 5911 Sunshine Dr have?
1 filing across 1 project, from June 27, 2025 to June 27, 2025.
Is there other construction near 5911 Sunshine Dr?
Yes. Nearby filings include 5913 Sunshine Dr (gas test and replace water heater, Aug 15, 2024); 908 Old Koenig Ln (kinsey will be excavating up to 130ft of main sewer line from building to city tap and installing new 4 schedule 40 pvc in its place with sand bed and two new cleanouts, Mar 3, 2025); 6003 Aurora Dr (install senville leto series mini split air conditioner heat pump 9000 btu 110/120v, Aug 8, 2025).
How do I get alerts for new permits at 5911 Sunshine Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 5913 Sunshine DrAug 15, 2024Gas test and replace water heater · 28 m away
- 908 Old Koenig LnMar 3, 2025Kinsey will be excavating up to 130ft of main sewer line from building to city tap and installing new 4 schedule 40 pvc in its place with sand bed and two new cleanouts · 59 m away
- 6003 Aurora DrAug 8, 2025Install senville leto series mini split air conditioner heat pump 9000 btu 110/120v · 89 m away
- 908-1/2 Old Koenig LnJan 21, 2022Verizon wirelss - koenig · 92 m away
- 911 Aurora CirJan 6, 2026We will be needing a t pole inspection and a meter ref: 2025-058553 bp · 94 m away
- 905 Old Koenig LnApr 22, 2009Rebuild of koenig lane substation · 115 m away
- 900 Old Koenig LnSep 12, 2024Total demolition of abandoned building circa 1976 · 128 m away
- 906 Aurora CirAug 21, 2026Replacement of an existing water heater water heater tankless changeout · 131 m away
- 5908 Aurora DrFeb 16, 2011The mediterranean chef · 133 m away
- 908 Aurora CirJun 9, 2026Replacement of an existing water heater 40gal gas tank located in the laundry room · 133 m away
- 6008 Aurora DrMar 31, 2025Replace approximately 30 feet of the sewer line in the yard with a new one · 139 m away
- 1100 Koenig LnJul 23, 2025Koenig mixed use development · 149 m away