groundranger
Recent · latest filing Jun 2025Residential

5911 Sunshine Dr

Austin, TX 78757

5911 Sunshine Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 5911 Sunshine Dr, Austin, TX 78757. The most recent, filed June 27, 2025, covers: “60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left”.

Compiled from City of Austin records · updated Jun 27, 2025

Projects
1
1 filings
Latest filing
Jun 27, 2025
since Jun 27, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left

  1. AppliedJun 24, 2025
  2. IssuedJun 27, 2025
  3. WorkJun '25 – Jul '25
  4. Final inspectionJul 11, 2025

Passed final inspection Jul 11, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left

    60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5911 Sunshine Dr

What is being built at 5911 Sunshine Dr?

The latest filing (City of Austin permit 2025-078295 PP, June 27, 2025) covers 60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left.

How many permits and filings does 5911 Sunshine Dr have?

1 filing across 1 project, from June 27, 2025 to June 27, 2025.

Is there other construction near 5911 Sunshine Dr?

Yes. Nearby filings include 5913 Sunshine Dr (gas test and replace water heater, Aug 15, 2024); 908 Old Koenig Ln (kinsey will be excavating up to 130ft of main sewer line from building to city tap and installing new 4 schedule 40 pvc in its place with sand bed and two new cleanouts, Mar 3, 2025); 6003 Aurora Dr (install senville leto series mini split air conditioner heat pump 9000 btu 110/120v, Aug 8, 2025).

How do I get alerts for new permits at 5911 Sunshine Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78757
Email me when a new permit is filed