5913 Sunshine Dr
Austin, TX 78757
5913 Sunshine Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5913 Sunshine Dr, Austin, TX 78757. The most recent, filed August 15, 2024, covers: “Gas test and replace water heater”.
Compiled from City of Austin records · updated Aug 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 15, 2024
- since Aug 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas test and replace water heater
- AppliedAug 13, 2024
- IssuedAug 15, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 20, 2024
Passed final inspection Aug 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas test and replace water heater
Gas test and replace water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-102142 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5913 Sunshine Dr
What is being built at 5913 Sunshine Dr?
The latest filing (City of Austin permit 2024-102142 PP, August 15, 2024) covers gas test and replace water heater.
How many permits and filings does 5913 Sunshine Dr have?
1 filing across 1 project, from August 15, 2024 to August 15, 2024.
Is there other construction near 5913 Sunshine Dr?
Yes. Nearby filings include 5911 Sunshine Dr (60 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left, Jun 27, 2025); 911 Aurora Cir (we will be needing a t pole inspection and a meter ref: 2025-058553 bp, Jan 6, 2026); 908 Old Koenig Ln (kinsey will be excavating up to 130ft of main sewer line from building to city tap and installing new 4 schedule 40 pvc in its place with sand bed and two new cleanouts, Mar 3, 2025).
How do I get alerts for new permits at 5913 Sunshine Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 5911 Sunshine DrJun 27, 202560 tunnel below the foundation to replace entire cast iron drain system and 70 trench thru yard to replace yard sewer. 3 access holes - front back left · 28 m away
- 911 Aurora CirJan 6, 2026We will be needing a t pole inspection and a meter ref: 2025-058553 bp · 77 m away
- 908 Old Koenig LnMar 3, 2025Kinsey will be excavating up to 130ft of main sewer line from building to city tap and installing new 4 schedule 40 pvc in its place with sand bed and two new cleanouts · 77 m away
- 6003 Aurora DrAug 8, 2025Install senville leto series mini split air conditioner heat pump 9000 btu 110/120v · 80 m away
- 908-1/2 Old Koenig LnJan 21, 2022Verizon wirelss - koenig · 102 m away
- 906 Aurora CirAug 21, 2026Replacement of an existing water heater water heater tankless changeout · 109 m away
- 908 Aurora CirJun 9, 2026Replacement of an existing water heater 40gal gas tank located in the laundry room · 113 m away
- 6008 Aurora DrMar 31, 2025Replace approximately 30 feet of the sewer line in the yard with a new one · 123 m away
- 900 Old Koenig LnSep 12, 2024Total demolition of abandoned building circa 1976 · 130 m away
- 905 Old Koenig LnApr 22, 2009Rebuild of koenig lane substation · 138 m away
- 5908 Aurora DrFeb 16, 2011The mediterranean chef · 154 m away
- 1003 Romeria DrJan 24, 2024Express: foundation repair · 154 m away