3201 Steck Ave
Austin, TX 78757
Electrical equipment work permitted at 3201 Steck Ave
City of Austin permits indicate electrical equipment replacement and maintenance at 3201 Steck Ave, most recently filed April 3, 2026. The active permit covers replacing three automatic transfer switches at the main service yard and calls for an Austin Energy shutdown. Other records include a 2025 disconnect-switch replacement and a 2024 sewer-line repair; the records provided do not describe a new building.
Summarized from City of Austin records · updated Apr 3, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Apr 3, 2026
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayWe want to change out three atss at the main service yard. this will require an austin energy shut down
- AppliedMar 27, 2026
- IssuedApr 3, 2026
- WorkApr '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
6 projectsWe want to change out three atss at the main service yard. this will require an austin energy shut down
We want to change out three atss at the main service yard. this will require an austin energy shut down
City of Austin permitElectrical PermitActive- Record
- 2026-037377 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We need to replace a 1200a disconnect switch with an identical switch. the disconnect cabinet will remain just the switch will be replaced. the reason for this replacement is because of age this switch was installed about 1986 and the owners are concerned that it might go out on them
We need to replace a 1200a disconnect switch with an identical switch. the disconnect cabinet will remain just the switch will be replaced. the reason for this replacement is because of age this switch was installed about 1986 and the owners are concerned that it might go out on them
City of Austin permitElectrical PermitFinal- Record
- 2025-089077 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Digging tunnel 48 by 48 to access under building near tree root base. purpose is to repair sewer drain line under building going down hallway
Digging tunnel 48 by 48 to access under building near tree root base. purpose is to repair sewer drain line under building going down hallway
City of Austin permitPlumbing PermitFinal- Record
- 2024-129179 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Kvue - exterior building channel letters
Kvue - exterior building channel letters
City of Austin permitElectrical PermitFinal- Record
- 2023-055501 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3201 Steck Ave
What is happening at 3201 Steck Ave in Austin?
City permits indicate electrical equipment work, including a permit filed April 3, 2026, to replace three automatic transfer switches at the main service yard. A 2024 permit covered a sewer drain-line repair under the building.
Is a new building being built at 3201 Steck Ave?
The records provided do not describe new building construction. They show electrical and plumbing work, along with site-plan cases approved in 2007.
What does permit 2026-037377 EP cover?
The active City of Austin electrical permit, filed April 3, 2026, covers changing out three automatic transfer switches at the main service yard and requires an Austin Energy shutdown.
What electrical work was permitted at 3201 Steck Ave in 2025?
Permit 2025-089077 EP, filed July 22, 2025, covered replacing a 1,200-amp disconnect switch with an identical switch. The permit is marked final.
Was sewer work permitted at 3201 Steck Ave?
Yes. Plumbing permit 2024-129179 PP, filed October 1, 2024, covered accessing and repairing a sewer drain line under the building. The permit is marked final.
What were the 2007 site-plan cases for 3201 Steck Ave?
Two City of Austin cases were approved and released on March 2, 2007: KVUE Renovation Phase II-A/B/C (case 147007) and KVUE Newsroom Expansion (case 151825).
Also being built nearby
All of 78757- 8217 Shoal Creek BlvdOct 31, 2024Non-structural demolition of certain interior walls add new walls for offices create an open office area redo ceiling grid in parts of the office. no work affects corridors no new sq ft interior remodel · 120 m away
- 8118 Shoal Creek BlvdAug 28, 2025Commercial metal re-roof · 128 m away
- 3301 Steck AveJan 10, 20253301 steck ave · 138 m away
- 8204 Daleview DrNov 2, 2026Tunnel under the foundation to replace the cast-iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes are required: one at the cleanout and one at the laundry · 148 m away
- 8105 Shoal Creek · Sunrise Road PartnersOct 24, 2024Austin gastro asc - mechanical equipment replacement — renovation/alteration — replace rtu's · 152 m away
- 8202 Millway DrAug 12, 2025Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc · 153 m away
- 3103 Steck AveJan 7, 2025Trenching 42 lf and tunneling 42lf to correct wastewater line breaks and areas holding water as indicated on the drawing · 159 m away
- 8229 Shoal Creek BlvdApr 28, 2026Emergency shutdown of transformer and replacing wire per hyatt dunn · 160 m away
- 8206 Daleview DrSep 23, 2025Replacement of complete existing central heat and air system with or without duct work change out · 162 m away
- 3305 Steck AveMar 2, 2007University federal credit union-northwest branch · 169 m away
- 8106 Vinewood LnApr 1, 202560 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front right back · 170 m away
- 3101 Steck AveApr 24, 2025Express - demolition kitchen remodel bathroom remodel doors and windows size for size replacement replace flooring paint interior and exterior · 177 m away