7528 Burnet Rd
Austin, TX 78757
Electrical upgrades permitted at 7528 Burnet Road
A City of Austin permit filed December 22, 2025, covers electrical upgrades inside the building at 7528 Burnet Road. The work includes replacing three subpanels and adding an exterior meter can and disconnect.
Summarized from City of Austin records · updated Dec 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 22, 2025
- since Dec 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace exiting sub panels (3) inside building and add new meter can and disconnect on outside of building
- AppliedDec 12, 2025
- IssuedDec 22, 2025
- WorkDec '25 – Jun '26
- Final inspectionJun 5, 2026
Passed final inspection Jun 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace exiting sub panels (3) inside building and add new meter can and disconnect on outside of building
Replace exiting sub panels (3) inside building and add new meter can and disconnect on outside of building
City of Austin permitElectrical PermitFinal- Record
- 2025-158070 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7528 Burnet Rd
What work is happening at 7528 Burnet Road?
A City of Austin electrical permit covers replacement of three subpanels inside the building and installation of an exterior meter can and disconnect.
When was the electrical permit filed for 7528 Burnet Road?
The permit was filed December 22, 2025. It is permit 2025-158070 EP.
Is a new building being constructed at 7528 Burnet Road?
The permit describes electrical work inside an existing building, not new construction.
What does permit 2025-158070 EP cover?
It covers replacing three interior subpanels and adding a meter can and disconnect outside the building.
What is the status of the permit at 7528 Burnet Road?
The City of Austin permit is listed with a status of Final.
Also being built nearby
All of 78757- 7514 Burnet RdApr 27, 2026Remove damaged storefront and 3 overhead doors replace with new. remove 1 layer tpo roof replace with new. remove existing canopy/ recessed lights/ sub-framing and replace with new 2025 073993 da - approved · 27 m away
- 7501 Burnet RdJan 19, 2026Need to replace riser and riser feeders due to insulation on feeder conductors is dry rotted and falling off · 56 m away
- 2412 Richcreek RdJun 23, 2025Re fasten hand railing on second floor remove and or repair 5 -7 concrete stairs remove and replace 1 4x4 post and 1 6x6 post fill in all concrete stress cracks. [7 day review] · 60 m away
- 7505 Daugherty StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 7507 Daugherty StJul 27, 2026Express: concrete piles house leveling and cast iron sewer line replacement · 95 m away
- 7509 Daugherty StJan 9, 2026Plumbing tunnel replacing sewer line 85 feet · 102 m away
- 7501 Daugherty StMar 31, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in the garage and backyard of the house · 106 m away
- 7511 Daugherty StFeb 11, 202562 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - right and left · 109 m away
- 7502 St Cecelia StMay 27, 2025Ev charger 50a gfci nema 1450 installed in garage · 110 m away
- 7545 Burnet RdJun 12, 2024Irrigation · 125 m away
- 7512 St Cecelia StDec 16, 2025Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 7506 Daugherty StDec 12, 2023Replace sewer line from house to city tap · 140 m away