7506 Daugherty St
Austin, TX 78757
7506 Daugherty St: 1 project on record
City of Austin lists 1 filing across 1 project at 7506 Daugherty St, Austin, TX 78757. The most recent, filed December 12, 2023, covers: “Replace sewer line from house to city tap”.
Compiled from City of Austin records · updated Dec 12, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 12, 2023
- since Dec 12, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer line from house to city tap
- AppliedDec 11, 2023
- IssuedDec 12, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 21, 2023
Passed final inspection Dec 21, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer line from house to city tap
Replace sewer line from house to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2023-157959 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7506 Daugherty St
What is being built at 7506 Daugherty St?
The latest filing (City of Austin permit 2023-157959 PP, December 12, 2023) covers replace sewer line from house to city tap.
How many permits and filings does 7506 Daugherty St have?
1 filing across 1 project, from December 12, 2023 to December 12, 2023.
Is there other construction near 7506 Daugherty St?
Yes. Nearby filings include 7508 Daugherty St (install new 10.5kw rooftop solar system for existing residential only, Jan 22, 2024); 7502 Daugherty St (replacement of complete existing central heat and air system with or without duct work, Jan 14, 2025); 7507 Daugherty St (express: concrete piles house leveling and cast iron sewer line replacement, Jul 27, 2026).
How do I get alerts for new permits at 7506 Daugherty St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 7508 Daugherty StJan 22, 2024Install new 10.5kw rooftop solar system for existing residential only · 23 m away
- 7502 Daugherty StJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 40 m away
- 7507 Daugherty StJul 27, 2026Express: concrete piles house leveling and cast iron sewer line replacement · 45 m away
- 7509 Daugherty StJan 9, 2026Plumbing tunnel replacing sewer line 85 feet · 49 m away
- 7505 Pineleaf PlFeb 5, 2025Replacement of an existing water heater gas water heater changeout like for like · 52 m away
- 7505 Daugherty StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 7511 Daugherty StFeb 11, 202562 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - right and left · 64 m away
- 7501 Daugherty StMar 31, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in the garage and backyard of the house · 78 m away
- 7501 Pineleaf PlFeb 27, 2024Schedule disconnect/reconenct with ae. reconfigure electrical service for solar and batteries · 79 m away
- 7515 Daugherty StOct 10, 202570 tunnel below the foundation to repair entire drain system. 3 access holes - front back back · 99 m away
- 2412 Richcreek RdJun 23, 2025Re fasten hand railing on second floor remove and or repair 5 -7 concrete stairs remove and replace 1 4x4 post and 1 6x6 post fill in all concrete stress cracks. [7 day review] · 107 m away
- 2507 Richcreek RdJun 25, 2026Replacement of complete existing central heat and air system with or without duct work · 129 m away