7502 Daugherty St
Austin, TX 78757
7502 Daugherty St: 1 project on record
City of Austin lists 1 filing across 1 project at 7502 Daugherty St, Austin, TX 78757. The most recent, filed January 14, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jan 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 14, 2025
- since Jan 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-037097 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7502 Daugherty St
What is being built at 7502 Daugherty St?
The latest filing (City of Austin permit 2024-037097 MP, January 14, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7502 Daugherty St have?
1 filing across 1 project, from January 14, 2025 to January 14, 2025.
Is there other construction near 7502 Daugherty St?
Yes. Nearby filings include 7506 Daugherty St (replace sewer line from house to city tap, Dec 12, 2023); 7505 Pineleaf Pl (replacement of an existing water heater gas water heater changeout like for like, Feb 5, 2025); 7501 Daugherty St (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in the garage and backyard of the house, Mar 31, 2026).
How do I get alerts for new permits at 7502 Daugherty St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 7506 Daugherty StDec 12, 2023Replace sewer line from house to city tap · 40 m away
- 7505 Pineleaf PlFeb 5, 2025Replacement of an existing water heater gas water heater changeout like for like · 49 m away
- 7501 Daugherty StMar 31, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in the garage and backyard of the house · 50 m away
- 7505 Daugherty StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 7501 Pineleaf PlFeb 27, 2024Schedule disconnect/reconenct with ae. reconfigure electrical service for solar and batteries · 53 m away
- 7507 Daugherty StJul 27, 2026Express: concrete piles house leveling and cast iron sewer line replacement · 60 m away
- 7508 Daugherty StJan 22, 2024Install new 10.5kw rooftop solar system for existing residential only · 64 m away
- 7509 Daugherty StJan 9, 2026Plumbing tunnel replacing sewer line 85 feet · 76 m away
- 2412 Richcreek RdJun 23, 2025Re fasten hand railing on second floor remove and or repair 5 -7 concrete stairs remove and replace 1 4x4 post and 1 6x6 post fill in all concrete stress cracks. [7 day review] · 93 m away
- 7405 Daugherty StFeb 26, 2026Add new balcony unpermitted screen porch to be demolished · 94 m away
- 7511 Daugherty StFeb 11, 202562 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - right and left · 96 m away
- 2507 Richcreek RdJun 25, 2026Replacement of complete existing central heat and air system with or without duct work · 97 m away