7508 Daugherty St
Austin, TX 78757
7508 Daugherty St: 1 project on record
City of Austin lists 1 filing across 1 project at 7508 Daugherty St, Austin, TX 78757. The most recent, filed January 22, 2024, covers: “Install new 10.5kw rooftop solar system for existing residential only”.
Compiled from City of Austin records · updated Jan 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 22, 2024
- since Jan 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 10.5kw rooftop solar system for existing residential only
- AppliedDec 18, 2023
- IssuedJan 22, 2024
- WorkJan '24 – Mar '24
- Final inspectionMar 21, 2024
Passed final inspection Mar 21, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new 10.5kw rooftop solar system for existing residential only
Install new 10.5kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2023-160647 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7508 Daugherty St
What is being built at 7508 Daugherty St?
The latest filing (City of Austin permit 2023-160647 EP, January 22, 2024) covers install new 10.5kw rooftop solar system for existing residential only.
How many permits and filings does 7508 Daugherty St have?
1 filing across 1 project, from January 22, 2024 to January 22, 2024.
Is there other construction near 7508 Daugherty St?
Yes. Nearby filings include 7506 Daugherty St (replace sewer line from house to city tap, Dec 12, 2023); 7509 Daugherty St (plumbing tunnel replacing sewer line 85 feet, Jan 9, 2026); 7507 Daugherty St (express: concrete piles house leveling and cast iron sewer line replacement, Jul 27, 2026).
How do I get alerts for new permits at 7508 Daugherty St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 7506 Daugherty StDec 12, 2023Replace sewer line from house to city tap · 23 m away
- 7509 Daugherty StJan 9, 2026Plumbing tunnel replacing sewer line 85 feet · 44 m away
- 7507 Daugherty StJul 27, 2026Express: concrete piles house leveling and cast iron sewer line replacement · 50 m away
- 7511 Daugherty StFeb 11, 202562 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - right and left · 50 m away
- 7502 Daugherty StJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 7505 Daugherty StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 7505 Pineleaf PlFeb 5, 2025Replacement of an existing water heater gas water heater changeout like for like · 66 m away
- 7515 Daugherty StOct 10, 202570 tunnel below the foundation to repair entire drain system. 3 access holes - front back back · 78 m away
- 7501 Daugherty StMar 31, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in the garage and backyard of the house · 98 m away
- 7501 Pineleaf PlFeb 27, 2024Schedule disconnect/reconenct with ae. reconfigure electrical service for solar and batteries · 99 m away
- 2412 Richcreek RdJun 23, 2025Re fasten hand railing on second floor remove and or repair 5 -7 concrete stairs remove and replace 1 4x4 post and 1 6x6 post fill in all concrete stress cracks. [7 day review] · 120 m away
- 7528 Burnet RdDec 22, 2025Replace exiting sub panels (3) inside building and add new meter can and disconnect on outside of building · 144 m away
More solar installs in 78757.