7509 Daugherty St
Austin, TX 78757
Sewer line replacement at 7509 Daugherty St
A plumbing permit covers a tunnel to replace 85 feet of sewer line at this residential address. The City of Austin permit was filed January 9, 2026, and is marked final.
Summarized from City of Austin records · updated Jan 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2026
- since Jan 9, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPlumbing tunnel replacing sewer line 85 feet
- AppliedJan 7, 2026
- IssuedJan 9, 2026
- WorkJan '26 – May '26
- Final inspectionMay 4, 2026
Passed final inspection May 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectPlumbing tunnel replacing sewer line 85 feet
Plumbing tunnel replacing sewer line 85 feet
City of Austin permitPlumbing PermitFinal- Record
- 2026-002292 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7509 Daugherty St
What is being built at 7509 Daugherty St?
A City of Austin plumbing permit describes a tunnel to replace 85 feet of sewer line. It does not indicate a new building.
When was the sewer work permitted at 7509 Daugherty St?
The permit was filed January 9, 2026. Permit number 2026-002292 PP is marked final.
What is permit 2026-002292 PP for?
It covers a plumbing tunnel to replace 85 feet of sewer line at 7509 Daugherty St.
Is a new home being built at 7509 Daugherty St?
The listed permit is for sewer line replacement, not new home construction.
What is happening near 7600 Burnet Road?
At 7509 Daugherty St, a City of Austin permit covers a tunnel to replace 85 feet of sewer line. The address is about 160 meters from 7600 Burnet Road.
Also being built nearby
All of 78757- 7511 Daugherty StFeb 11, 202562 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - right and left · 21 m away
- 7507 Daugherty StJul 27, 2026Express: concrete piles house leveling and cast iron sewer line replacement · 22 m away
- 7505 Daugherty StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 7508 Daugherty StJan 22, 2024Install new 10.5kw rooftop solar system for existing residential only · 44 m away
- 7506 Daugherty StDec 12, 2023Replace sewer line from house to city tap · 49 m away
- 7515 Daugherty StOct 10, 202570 tunnel below the foundation to repair entire drain system. 3 access holes - front back back · 67 m away
- 7502 Daugherty StJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 7501 Daugherty StMar 31, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holds in the garage and backyard of the house · 86 m away
- 2412 Richcreek RdJun 23, 2025Re fasten hand railing on second floor remove and or repair 5 -7 concrete stairs remove and replace 1 4x4 post and 1 6x6 post fill in all concrete stress cracks. [7 day review] · 89 m away
- 7505 Pineleaf PlFeb 5, 2025Replacement of an existing water heater gas water heater changeout like for like · 101 m away
- 7528 Burnet RdDec 22, 2025Replace exiting sub panels (3) inside building and add new meter can and disconnect on outside of building · 102 m away
- 7514 Burnet RdApr 27, 2026Remove damaged storefront and 3 overhead doors replace with new. remove 1 layer tpo roof replace with new. remove existing canopy/ recessed lights/ sub-framing and replace with new 2025 073993 da - approved · 114 m away