groundranger
Historic · latest filing Jan 2025Residential

10002 Kabar Trl

Austin, TX 78759

10002 Kabar Trl: 3 projects on record

City of Austin lists 3 filings across 3 projects at 10002 Kabar Trl, Austin, TX 78759 since August 19, 2024. The most recent, filed January 8, 2025, covers: “Tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout”.

Compiled from City of Austin records · updated Jan 8, 2025

Projects
3
3 filings
Latest filing
Jan 8, 2025
since Aug 19, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout

  1. AppliedJan 3, 2025
  2. IssuedJan 8, 2025
  3. WorkJan '25 – Jan '25
  4. Final inspectionJan 31, 2025

Passed final inspection Jan 31, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout

    Tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Solar system addition

    Solar system addition

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Repair permit for outage

    Repair permit for outage

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10002 Kabar Trl

What is being built at 10002 Kabar Trl?

The latest filing (City of Austin permit 2025-000836 PP, January 8, 2025) covers tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout.

How many permits and filings does 10002 Kabar Trl have?

3 filings across 3 projects, from August 19, 2024 to January 8, 2025.

Is there other construction near 10002 Kabar Trl?

Yes. Nearby filings include 10000 Kabar Trl (replacement of furnace only, Jan 24, 2024); 10100 Vaquero Trl (replacement of an existing water heater, Oct 13, 2025); 10007 Kabar Trl (replacement of complete existing central heat and air system with or without duct work hvac change out, Aug 27, 2026).

How do I get alerts for new permits at 10002 Kabar Trl?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78759

More solar installs in 78759.

Email me when a new permit is filed