10100 Vaquero Trl
Austin, TX 78759
10100 Vaquero Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 10100 Vaquero Trl, Austin, TX 78759. The most recent, filed October 13, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Oct 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 13, 2025
- since Oct 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedOct 6, 2025
- IssuedOct 13, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 3, 2025
Passed final inspection Nov 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-129348 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10100 Vaquero Trl
What is being built at 10100 Vaquero Trl?
The latest filing (City of Austin permit 2025-129348 PP, October 13, 2025) covers replacement of an existing water heater.
How many permits and filings does 10100 Vaquero Trl have?
1 filing across 1 project, from October 13, 2025 to October 13, 2025.
Is there other construction near 10100 Vaquero Trl?
Yes. Nearby filings include 10002 Kabar Trl (tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout, Jan 8, 2025); 10007 Kabar Trl (replacement of complete existing central heat and air system with or without duct work hvac change out, Aug 27, 2026); 10000 Kabar Trl (replacement of furnace only, Jan 24, 2024).
How do I get alerts for new permits at 10100 Vaquero Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 10002 Kabar TrlJan 8, 2025Tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout · 34 m away
- 10007 Kabar TrlAug 27, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 53 m away
- 10000 Kabar TrlJan 24, 2024Replacement of furnace only · 55 m away
- 10103 Vaquero TrlJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 10101 Kabar TrlFeb 10, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 10003 Kabar TrlDec 10, 2025200amp panel replacement and grounding · 81 m away
- 10102 Kabar TrlFeb 10, 2025Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 8400 Horse Mountain CvMar 27, 2024Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 10001 Kabar TrlMar 28, 2025Tankless water heater install · 93 m away
- 8401 Horse Mountain CvMay 7, 202510x12 unconditioned sunroom addition on new concrete pad attached to house · 106 m away
- 9907 Kabar TrlMay 6, 2026Interior remodel to replace attached uncovered wood deck structural components decking with identical plan and footprint · 113 m away
- 10109 Vaquero TrlJul 28, 2025Excavate 88 tunnel to repair main drain line under house and excavate 33 trench to repair drain line in yard · 119 m away