10003 Kabar Trl
Austin, TX 78759
Electrical panel replacement at 10003 Kabar Trl
A 200-amp electrical panel replacement and grounding was permitted at 10003 Kabar Trl on December 10, 2025. The City of Austin permit, 2025-155557 EP, is marked final.
Summarized from City of Austin records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled200amp panel replacement and grounding
- AppliedDec 8, 2025
- IssuedDec 10, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 8, 2026
Passed final inspection Jan 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project200amp panel replacement and grounding
200amp panel replacement and grounding
City of Austin permitElectrical PermitFinal- Record
- 2025-155557 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10003 Kabar Trl
What is being done at 10003 Kabar Trl?
A City of Austin permit records a 200-amp panel replacement and grounding at the address.
When was the electrical work at 10003 Kabar Trl permitted?
The permit was filed on December 10, 2025.
What is the permit number for 10003 Kabar Trl?
The permit number is 2025-155557 EP.
Is the permit for 10003 Kabar Trl final?
Yes. The City of Austin lists permit 2025-155557 EP as final.
Is a new home being built at 10003 Kabar Trl?
The available City of Austin record is for electrical panel replacement and grounding, not a new-home construction permit.
Also being built nearby
All of 78759- 10001 Kabar TrlMar 28, 2025Tankless water heater install · 32 m away
- 10007 Kabar TrlAug 27, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 50 m away
- 10000 Kabar TrlJan 24, 2024Replacement of furnace only · 69 m away
- 10002 Kabar TrlJan 8, 2025Tunnel to expose and replace broken main drain total tunnel length: 10 ft single access hole on left side of property at main line cleanout · 69 m away
- 9907 Kabar TrlMay 6, 2026Interior remodel to replace attached uncovered wood deck structural components decking with identical plan and footprint · 70 m away
- 10100 Vaquero TrlOct 13, 2025Replacement of an existing water heater · 81 m away
- 10101 Kabar TrlFeb 10, 2026Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 8401 Horse Mountain CvMay 7, 202510x12 unconditioned sunroom addition on new concrete pad attached to house · 127 m away
- 8400 Horse Mountain CvMar 27, 2024Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 10103 Vaquero TrlJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 8403 Horse Mountain CvJun 12, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 5 ton ac system · 142 m away
- 10102 Kabar TrlFeb 10, 2025Replacement of complete existing central heat and air system with or without duct work · 146 m away