8406 Emerald Hill Dr
Austin, TX 78759
Fuel-generator plumbing and electrical work at 8406 Emerald Hill Dr
City of Austin permits indicate plumbing and electrical work at the commercial property, which records categorize as a gas station. The electrical permit was filed August 26, 2024, and the plumbing permit for adding NG to a fuel generator was filed September 23, 2024; neither record lists a project value.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayTunnel under foundation to replace cast iron drains with sch 40 pvc material there is a total of 2 full bathrooms and a half bathroom with kitchen and washer drain. 2 access holes: one outside the kitchen window on the exterior second access hole will be made on the right side of the home where drain line exits the foundation total length of the tunnel is approximately 120 feet long. sewer line will be replaced from the home to the city tap with a total length of 60 feet
- AppliedNov 4, 2026
- IssuedNov 18, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
4 projectsTunnel under foundation to replace cast iron drains with sch 40 pvc material there is a total of 2 full bathrooms and a half bathroom with kitchen and washer drain. 2 access holes: one outside the kitchen window on the exterior second access hole will be made on the right side of the home where drain line exits the foundation total length of the tunnel is approximately 120 feet long. sewer line will be replaced from the home to the city tap with a total length of 60 feet
Tunnel under foundation to replace cast iron drains with sch 40 pvc material there is a total of 2 full bathrooms and a half bathroom with kitchen and washer drain. 2 access holes: one outside the kitchen window on the exterior second access hole will be made on the right side of the home where drain line exits the foundation total length of the tunnel is approximately 120 feet long. sewer line will be replaced from the home to the city tap with a total length of 60 feet
City of Austin permitPlumbing PermitActive- Record
- 2026-145978 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Plumber to add ng to fuel generator
Plumber to add ng to fuel generator
City of Austin permitPlumbing PermitFinal- Record
- 2024-126924 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect install a 200 amp transfer switch to existing 200 amp service meter can to remain
Request to disconnect install a 200 amp transfer switch to existing 200 amp service meter can to remain
City of Austin permitElectrical PermitFinal- Record
- 2024-105138 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8406 Emerald Hill Dr
What is being built at 8406 Emerald Hill Dr?
The City of Austin permits describe electrical work and plumbing to add NG to a fuel generator. They do not describe a new building.
Is a new gas station opening at 8406 Emerald Hill Dr?
The records classify the property as a gas station, but the listed 2024 permits do not indicate a new station opening. They cover electrical and fuel-generator plumbing work.
What was permitted at 8406 Emerald Hill Dr in 2024?
An electrical permit, 2024-105138 EP, was filed August 26, 2024, for a transfer switch installation. A plumbing permit, 2024-126924 PP, was filed September 23, 2024, to add NG to a fuel generator.
What is the plumbing permit for at 8406 Emerald Hill Dr?
Permit 2024-126924 PP, filed September 23, 2024, describes plumbing work to add NG to a fuel generator. The permit is listed as final.
What is the electrical permit for at 8406 Emerald Hill Dr?
Permit 2024-105138 EP, filed August 26, 2024, describes disconnecting and installing a 200-amp transfer switch connected to the existing 200-amp service. The permit is listed as final.
When was the property at 8406 Emerald Hill Dr first listed in city records?
The earliest record in this sheet is an amended plat recorded April 26, 2011, for Westover Hills, Section 4, Block G, Lots 3 and 4.
Also being built nearby
All of 78759- 8408 Hayes LnMar 2, 2026Tunnel under house to expose all drain lines approximately 85 feet in developed length. we will also be replacing and rerouting the sewer line approximately 60 feet from the house cleanout to the city tap · 33 m away
- 8400 Mesa Doble LnAug 31, 2026Install 12k ductless mini split system (master bedroom) · 39 m away
- 8405 Emerald Hill DrNov 16, 2026Addition and remodel for existing 1-story single family residence. remodel to convert one bathroom to two adjacent bathrooms between bedroom 3 and bedroom 2. remodel of kitchen/living area remodel of master bedroom. partial garage conversion to a pantry and half bathroom with existing garage reduced in size. addition includes new shower/tub area and toilet room in master bathroom · 53 m away
- 8322 Adirondack TrlOct 19, 2026Replace existing pressure vacuum breaker (pvb) backflow prevention assembly on pool filler with new reduced pressure zone (rpz) backflow assembly. new device: watts lf009m3qt 3/4 inch serial 554723. old device serial h940238. device location: right front behind a/c unit. installed and tested 10/7/2026 - passed. test report filed in weirs 10/13/2026 · 66 m away
- 8320 Adirondack TrlJun 11, 2026Replacement of an existing water heater 40gal gas tank located on the 2nd floor · 68 m away
- 8501 Emerald Hill DrMar 28, 2024Replace the cast iron drain system by way of a tunnel under foundation · 76 m away
- 8406 Alta Verde DrMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical heatpump system · 96 m away
- 8408 Silver Ridge DrAug 19, 2026Replacing flooring replacing kitchen island and cabinet in kitchen. creating new laundry room and enclosing front porch. front porch will remain non air conditioned. non-compliant storage building to be removed · 97 m away
- 4103 Walhill LnFeb 3, 2026Replacement of complete existing central heat and air system with or without duct work replace current system with new 2 ton carrier comfort series system. new 26sca5 condenser and cvama43 coil on r454b refrigerant with 58sb0b09 furnace · 100 m away
- 4201 Walhill LnJan 13, 2026Express - remove and replace 17 windows like for like · 111 m away
- 8400 Lone MesaJun 8, 2026Replacing panel with 200 amp and new meter can with 200 amp · 115 m away
- 8500 Silver Ridge DrMar 12, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet · 116 m away