8501 Emerald Hill Dr
Austin, TX 78759
8501 Emerald Hill Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8501 Emerald Hill Dr, Austin, TX 78759. The most recent, filed March 28, 2024, covers: “Replace the cast iron drain system by way of a tunnel under foundation”.
Compiled from City of Austin records · updated Mar 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 28, 2024
- since Mar 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace the cast iron drain system by way of a tunnel under foundation
- AppliedMar 20, 2024
- IssuedMar 28, 2024
- WorkMar '24 – Apr '24
- Final inspectionApr 10, 2024
Passed final inspection Apr 10, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace the cast iron drain system by way of a tunnel under foundation
Replace the cast iron drain system by way of a tunnel under foundation
City of Austin permitPlumbing PermitFinal- Record
- 2024-035017 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8501 Emerald Hill Dr
What is being built at 8501 Emerald Hill Dr?
The latest filing (City of Austin permit 2024-035017 PP, March 28, 2024) covers replace the cast iron drain system by way of a tunnel under foundation.
How many permits and filings does 8501 Emerald Hill Dr have?
1 filing across 1 project, from March 28, 2024 to March 28, 2024.
Is there other construction near 8501 Emerald Hill Dr?
Yes. Nearby filings include 8405 Emerald Hill Dr (addition and remodel for existing 1-story single family residence. remodel to convert one bathroom to two adjacent bathrooms between bedroom 3 and bedroom 2. remodel of kitchen/living area remodel of master bedroom. partial garage conversion to a pantry and half bathroom with existing garage reduced in size. addition includes new shower/tub area and toilet room in master bathroom, Nov 16, 2026); 8408 Silver Ridge Dr (replacing flooring replacing kitchen island and cabinet in kitchen. creating new laundry room and enclosing front porch. front porch will remain non air conditioned. non-compliant storage building to be removed, Aug 19, 2026); 8500 Silver Ridge Dr (tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet, Mar 12, 2026).
How do I get alerts for new permits at 8501 Emerald Hill Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78759- 8405 Emerald Hill DrNov 16, 2026Addition and remodel for existing 1-story single family residence. remodel to convert one bathroom to two adjacent bathrooms between bedroom 3 and bedroom 2. remodel of kitchen/living area remodel of master bedroom. partial garage conversion to a pantry and half bathroom with existing garage reduced in size. addition includes new shower/tub area and toilet room in master bathroom · 38 m away
- 8408 Silver Ridge DrAug 19, 2026Replacing flooring replacing kitchen island and cabinet in kitchen. creating new laundry room and enclosing front porch. front porch will remain non air conditioned. non-compliant storage building to be removed · 55 m away
- 8500 Silver Ridge DrMar 12, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet · 56 m away
- 8406 Emerald Hill DrNov 18, 2026Tunnel under foundation to replace cast iron drains with sch 40 pvc material there is a total of 2 full bathrooms and a half bathroom with kitchen and washer drain. 2 access holes: one outside the kitchen window on the exterior second access hole will be made on the right side of the home where drain line exits the foundation total length of the tunnel is approximately 120 feet long. sewer line will be replaced from the home to the city tap with a total length of 60 feet · 76 m away
- 4103 Walhill LnFeb 3, 2026Replacement of complete existing central heat and air system with or without duct work replace current system with new 2 ton carrier comfort series system. new 26sca5 condenser and cvama43 coil on r454b refrigerant with 58sb0b09 furnace · 78 m away
- 8506 Emerald Hill DrJun 29, 2026Replacement of an existing water heater 40gal gas tank · 88 m away
- 8400 Mesa Doble LnAug 31, 2026Install 12k ductless mini split system (master bedroom) · 98 m away
- 8506 Silver Ridge DrDec 22, 2025Addition - addition of a covered front porch to existing home. minor electric work to add fans/lights. rolled in expired pp · 102 m away
- 4201 Walhill LnJan 13, 2026Express - remove and replace 17 windows like for like · 103 m away
- 8408 Hayes LnMar 2, 2026Tunnel under house to expose all drain lines approximately 85 feet in developed length. we will also be replacing and rerouting the sewer line approximately 60 feet from the house cleanout to the city tap · 107 m away
- 8501 Silver Ridge DrOct 3, 2024Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 8407 Silver Ridge DrMay 15, 2026New in-ground pool spa and concrete deck · 114 m away