groundranger
Historic · latest filing Mar 2024Residential

8501 Emerald Hill Dr

Austin, TX 78759

8501 Emerald Hill Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 8501 Emerald Hill Dr, Austin, TX 78759. The most recent, filed March 28, 2024, covers: “Replace the cast iron drain system by way of a tunnel under foundation”.

Compiled from City of Austin records · updated Mar 28, 2024

Projects
1
1 filings
Latest filing
Mar 28, 2024
since Mar 28, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace the cast iron drain system by way of a tunnel under foundation

  1. AppliedMar 20, 2024
  2. IssuedMar 28, 2024
  3. WorkMar '24 – Apr '24
  4. Final inspectionApr 10, 2024

Passed final inspection Apr 10, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replace the cast iron drain system by way of a tunnel under foundation

    Replace the cast iron drain system by way of a tunnel under foundation

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8501 Emerald Hill Dr

What is being built at 8501 Emerald Hill Dr?

The latest filing (City of Austin permit 2024-035017 PP, March 28, 2024) covers replace the cast iron drain system by way of a tunnel under foundation.

How many permits and filings does 8501 Emerald Hill Dr have?

1 filing across 1 project, from March 28, 2024 to March 28, 2024.

Is there other construction near 8501 Emerald Hill Dr?

Yes. Nearby filings include 8405 Emerald Hill Dr (addition and remodel for existing 1-story single family residence. remodel to convert one bathroom to two adjacent bathrooms between bedroom 3 and bedroom 2. remodel of kitchen/living area remodel of master bedroom. partial garage conversion to a pantry and half bathroom with existing garage reduced in size. addition includes new shower/tub area and toilet room in master bathroom, Nov 16, 2026); 8408 Silver Ridge Dr (replacing flooring replacing kitchen island and cabinet in kitchen. creating new laundry room and enclosing front porch. front porch will remain non air conditioned. non-compliant storage building to be removed, Aug 19, 2026); 8500 Silver Ridge Dr (tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet, Mar 12, 2026).

How do I get alerts for new permits at 8501 Emerald Hill Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78759
Email me when a new permit is filed