groundranger
Recent · latest filing Mar 2026Residential

8500 Silver Ridge Dr

Austin, TX 78759

Sewer line replacement permitted at 8500 Silver Ridge Dr

A plumbing permit filed March 12, 2026, covers sewer and drain line replacement at the home at 8500 Silver Ridge Dr. The work includes about 77 feet of tunneling under the foundation and about 90 feet of sewer line replacement to the city tap.

Summarized from City of Austin records · updated Mar 12, 2026

Projects
1
1 filings
Latest filing
Mar 12, 2026
since Mar 12, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet

  1. AppliedMar 3, 2026
  2. IssuedMar 12, 2026
  3. WorkMar '26 – Mar '26
  4. Final inspectionMar 17, 2026

Passed final inspection Mar 17, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet

    Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and 1/2 bathroom with kitchen and washer drain line. total length of tunnel is approximately 77 feet total of 4 access holes one on the back left side of the home and the other 3 in the front of the home. we will replace main sewer line from the home to the city tap connection total length of sewer line is approximately 90 feet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8500 Silver Ridge Dr

What work is planned at 8500 Silver Ridge Dr?

A City of Austin plumbing permit describes replacing cast-iron drain lines serving two full bathrooms, a half bathroom, the kitchen and the washer. The work also includes replacing the sewer line from the home to the city tap.

When was the permit filed for 8500 Silver Ridge Dr?

The permit was filed March 12, 2026. Its number is 2026-025730 PP.

How much tunneling is planned at 8500 Silver Ridge Dr?

The permit describes about 77 feet of tunneling under the foundation, with four access holes.

Is the sewer line at 8500 Silver Ridge Dr being replaced?

Yes. Permit 2026-025730 PP describes replacing about 90 feet of sewer line from the home to the city tap.

What is permit 2026-025730 PP for in Austin?

The City of Austin plumbing permit is for drain line and sewer line replacement at 8500 Silver Ridge Dr. The record lists the permit status as Final.

Also being built nearby

All of 78759

More restaurants in 78759.

Email me when a new permit is filed