groundranger
Recent · latest filing Dec 2025Residential

12316 Honey Mesquite Way

Bee Cave, TX 78738

Natural-gas whole-home generator permitted in Bee Cave

An electrical permit filed December 5, 2025, covers a 48-kilowatt natural-gas whole-home generator connected to the house meter and main panel at 12316 Honey Mesquite Way. The City of Austin permit, 2025-150823 EP, is listed as Final and notes that an Austin Energy disconnect is required.

Summarized from City of Austin records · updated Dec 5, 2025

Projects
1
1 filings
Latest filing
Dec 5, 2025
since Dec 5, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Etj-bee caves full purpose 48kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (david lietzke)

  1. AppliedNov 24, 2025
  2. IssuedDec 5, 2025
  3. WorkDec '25 – Dec '25
  4. Final inspectionDec 29, 2025

Passed final inspection Dec 29, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Etj-bee caves full purpose 48kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (david lietzke)

    Etj-bee caves full purpose 48kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (david lietzke)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12316 Honey Mesquite Way

What is being built at 12316 Honey Mesquite Way?

A City of Austin electrical permit describes a 48-kilowatt natural-gas whole-home generator connected to the house meter and main panel.

When was the generator permit filed?

The permit was filed December 5, 2025. It is listed as Final.

What is the permit number for 12316 Honey Mesquite Way?

The electrical permit number is 2025-150823 EP.

Is this a permit for a new house?

No. The permit description is for a whole-home generator connected to a house meter and main panel; it does not describe construction of a new house.

Does the generator permit require an Austin Energy disconnect?

Yes. The permit description says an Austin Energy disconnect is required.

Also being built nearby

All of 78738
Email me when a new permit is filed