4808 Honey Daisy Way
Bee Cave, TX 78738
Electrical permits for a single-family home at 4808 Honey Daisy Way
City of Austin electrical permits indicate work for construction of a single-family dwelling at 4808 Honey Daisy Way in Bee Cave’s ETJ. A July 24, 2025 permit covers a temporary construction pole, and an October 16, 2025 permit covers a 600-amp underground electrical service.
Summarized from City of Austin records · updated Oct 16, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 16, 2025
- since Jul 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj-new sfr 11984 sq ft ae permanent power build a 600 amp underground service for construction of a single-family dwelling
- AppliedOct 9, 2025
- IssuedOct 16, 2025
- WorkOct '25 – Feb '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsEtj-new sfr 11984 sq ft ae permanent power build a 600 amp underground service for construction of a single-family dwelling
Etj-new sfr 11984 sq ft ae permanent power build a 600 amp underground service for construction of a single-family dwelling
City of Austin permitElectrical PermitActive- Record
- 2025-131069 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Underground t-pole for construction of a single family dwelling unit in an etj ***bee cave etj
Underground t-pole for construction of a single family dwelling unit in an etj ***bee cave etj
City of Austin permitElectrical PermitFinal- Record
- 2025-092039 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4808 Honey Daisy Way
What is being built at 4808 Honey Daisy Way?
City of Austin permit descriptions indicate construction of a single-family dwelling. The records cover electrical work, including a temporary construction pole and a 600-amp underground service.
When was the home at 4808 Honey Daisy Way permitted?
The first listed filing was July 24, 2025, for permit 2025-092039 EP. The latest was October 16, 2025, for permit 2025-131069 EP.
What does permit 2025-131069 EP cover?
The October 16, 2025, City of Austin electrical permit covers a 600-amp underground service for construction of a single-family dwelling. Its status is listed as active.
What is permit 2025-092039 EP for?
The July 24, 2025, electrical permit covers an underground temporary construction pole for a single-family dwelling in the Bee Cave ETJ. Its status is listed as final.
Is 4808 Honey Daisy Way a commercial project?
Although the property record categorizes the site as commercial, the permit descriptions identify work for a single-family dwelling. The listed filings are electrical permits.
Also being built nearby
All of 78738- 4901 Honey Daisy WayOct 16, 2025Etj- new ae service build a 600 amp underground service for construction of a single-family dwelling 11.528 sq ft · 80 m away
- 4909 Honey Daisy WayMay 27, 2025Pre-wire · 130 m away
- 12609 Flowering Senna BndJun 30, 2026Install additional 11.0 kw dc rooftop solar system to existing residential · 145 m away
- 12208 Honey Mesquite WayNov 4, 2024Disconnect and reconnect installation of new service rated generac transfer switch and generator · 162 m away
- 12316 Honey Mesquite WayDec 5, 2025Etj-bee caves full purpose 48kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (david lietzke) · 176 m away
- 5001 Honey Daisy WayAug 28, 2025Installation of 61.92 kw tesla solar roof (8) tesla powerwall 3 batteries 1707000-xx-y and (12) tesla powerwall 3 expansion packs 1807000-xx-y · 184 m away
- 12501 Flowering Senna BndMay 7, 2026Irrigation for lawn · 265 m away
- 13009 Flowering Senna BndJan 30, 2025350 amp new construction in the etj · 342 m away
- 5116 Honey Daisy WayAug 29, 2025Rooftop solar 14.96 kw microinverters tesla powerwall 3 and ats partial home backup · 365 m away
- 11919 La Barzola BndDec 8, 2025Request to disconnect install a meter collar on an ae meter base behind the ae meter as part of an ess i will be installing. installation involves reconfiguring existing solar bos components so i will need access to the pv meter as well · 371 m away
- 12301 Flowering Senna BndJun 24, 2024New electrical service for new construction of sfr in bee caves etj · 467 m away
- 5123 Indigo Spires WayJun 17, 2025New 600 amp electrical service in etj · 492 m away
More new homes in 78738.