groundranger
Recent · latest filing Jun 2026Residential

12609 Flowering Senna Bnd

Bee Cave, TX 78738

Additional rooftop solar permitted at Flowering Senna Bnd home

Permits indicate additional rooftop solar is being installed at the existing residence at 12609 Flowering Senna Bnd. An electrical permit dated June 30, 2026, covers an additional 11.0 kW DC system and is listed as active. A May 6, 2025, permit covered a 3.22 kW DC system and 20.0 kWh of energy storage.

Summarized from City of Austin records · updated Jun 30, 2026

Projects
5
5 filings
Latest filing
Jun 30, 2026
since Dec 18, 2023
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Install additional 11.0 kw dc rooftop solar system to existing residential

  1. AppliedJun 17, 2026
  2. IssuedJun 30, 2026
  3. WorkJun '26 – Jan '27
  4. Final inspection
76% through of the permit windowJun 30, 2026 → Jan 4, 2027

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Install additional 11.0 kw dc rooftop solar system to existing residential

    Install additional 11.0 kw dc rooftop solar system to existing residential

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install (new) 3.22 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential

    Install (new) 3.22 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Prewire for solar

    Prewire for solar

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. New etj electric 600-amp service

    New etj electric 600-amp service

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Etj hbl loop

    Etj hbl loop

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12609 Flowering Senna Bnd

What is being built at 12609 Flowering Senna Bnd?

Permit records indicate rooftop solar work at an existing residence, not a new home. The latest permit covers an additional 11.0 kW DC system.

Is solar being installed at 12609 Flowering Senna Bnd in Bee Cave?

Yes. City of Austin permit 2026-077960 EP, dated June 30, 2026, covers an additional rooftop solar system and is listed as active.

When was the solar work at 12609 Flowering Senna Bnd permitted?

The latest solar permit was filed June 30, 2026. Earlier records include a permit dated May 6, 2025, and a solar prewire permit dated January 8, 2025.

Is there an energy storage system at 12609 Flowering Senna Bnd?

A May 6, 2025, permit, 2025-054606 EP, covers a 20.0 kWh energy storage system alongside a 3.22 kW DC rooftop solar system.

What does permit 2026-077960 EP cover?

It covers installation of an additional 11.0 kW DC rooftop solar system at the existing residence. The permit is dated June 30, 2026, and listed as active.

Also being built nearby

All of 78738

More warehouses & industrial in 78738, solar installs in 78738.

Email me when it passes final inspection