1929 Courtside Dr
Dallas, TX 75051
Composite roof replacement permitted at 1929 Courtside Dr
A composite roof replacement is permitted at the residence at 1929 Courtside Dr. The City of Dallas issued the residential roofing permit on June 11, 2026 (permit RES-ROOF-26-000930).
Summarized from City of Dallas records · updated Jun 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2026
- since Jun 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1929 Courtside Dr
What is being built at 1929 Courtside Dr?
The City of Dallas permit describes composite re-roofing work at the residence, not a new building. The permit was filed June 11, 2026.
Is a new home being built at 1929 Courtside Dr?
The available record is for a residential roofing permit and describes a composite re-roof. It does not list a new-home construction permit.
When was the roof replacement permitted?
The City of Dallas issued the permit on June 11, 2026. Its number is RES-ROOF-26-000930.
What kind of roof is planned at 1929 Courtside Dr?
The permit description says “Composite re roof.” It does not provide further material or design details.
How much will the roof replacement cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 75051- 1933 Courtside DrJun 3, 2026Composite re roof · 2 m away
- 1969 Courtside DrSep 8, 2025Install (1) 50 gal elec water heater in garage (change out) · 16 m away
- 1913 Sampsell DrNov 12, 2025Mcr with battery installation of a 17 modules - roofmounted - 7.310 kw dc, 5.933 kw ac with 1 tesla powerwall 3 (1707000-xx-y) 13.5kwh and a 200a main panel upgrade · 130 m away
- 1946 Courtside DrMay 16, 2025Replace meter base and add 200 amp disconnect · 135 m away
- 1945 Sampsell DrMay 12, 2025This residential project involves removing the existing hvac system and installing new equipment, including a furnace and air conditioning unit. refrigerant and condensate lines will be replaced as needed to meet current code and ensure balanced airflow. all work will comply with local residential building and mechanical codes and will be inspected and tested upon completion · 204 m away
- 1923 Pez DrJan 29, 2026Cleanouts in yard · 238 m away
- 1961 Sampsell DrAug 6, 2025Install (1) 40 gal elec water heater in garage (swap out) · 243 m away
- 1931 Pez DrJul 8, 2026Composite re roof · 251 m away
- 1947 Pez DrJul 27, 20263 ton condenser change-out in backyard with 10k btus air handler change-out in attic · 278 m away
- 1919 Amerigo DrAug 18, 2026Re-roof, removing shingles down to deck installed new underlayment new 30 yr shingles · 322 m away
- 1923 Amerigo DrAug 13, 20252 ton straight ac system horizontal · 326 m away
- 1626 Nina DrJun 8, 2026Composite re roof · 355 m away