2425 Mckinney Ave
Dallas, TX 75201
Permit filed to demolish Gold's Gym structure
A City of Dallas permit filed May 18, 2026, calls for demolishing and hauling away the structure identified as Gold's Gym and its associated foundation at 2425 McKinney Ave. The permit does not identify what may be built there next.
Summarized from City of Dallas records · updated May 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 18, 2026
- since May 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2425 Mckinney Ave
What is being built at 2425 McKinney Ave?
The permit on record is for demolition, not new construction. It calls for removing the Gold's Gym structure and its associated foundation.
Is the Gold's Gym building on McKinney Avenue being demolished?
A City of Dallas Commercial Demolition Permit, COM-DEM-26-000055, filed May 18, 2026, calls for demolishing and hauling away the structure identified as Gold's Gym.
When was the demolition permit filed for 2425 McKinney Ave?
The permit was filed May 18, 2026. Its number is COM-DEM-26-000055.
What's being demolished near Whole Foods Market on McKinney Avenue?
The permit calls for demolition of the Gold's Gym structure at 2425 McKinney Ave, about 13 meters from Whole Foods Market at 2510 McKinney Ave.
Is a new gym opening at 2425 McKinney Ave?
The record shows a demolition permit for the Gold's Gym structure, but it does not say whether a new gym or another use is planned.
Also being built nearby
All of 75201- 2510 Mckinney Ave · Lg Routh LPOct 21, 2026Interior remodel. demolition an existing bar (previously served alcohol/mixed drinks) and convert that space into a new coffee and juice bar. the current coffee and juice bar location will then be converted to house the wfmao program. project is a two-part relocation that cascades through both spaces · 13 m away
- 2401 Mckinney AveSep 23, 2026Lvl6 garage qteam meeting 1.22.2026 (all day) phase i project, below grade garage up to lid of foundation proposed at this time to service future office tower. vertical drawings shown for reference of future phase · 14 m away
- 2530 Fairmount StNov 3, 2026Assembly of the new indoor walk-in combo box and installation of the remote refrigeration equipment for the new cooler and freezer · 37 m away
- 2530 Fairmount St · Tl Re LLCNov 4, 2025Fairmount restaurant — renovation/alteration — full interior renovation with exterior updates as required · 37 m away
- 2515 Mckinney Ave · Chateau Plaza Holdings, LPSep 26, 2025Electrical interior remodel · 51 m away
- 2515 MckinneyJul 2, 2025Commercial plumbing · 51 m away
- 2523 Mckinney Ave · Or Asset Holdings LPOct 6, 2026Installing 13ft type 1 vent hood · 55 m away
- 2408 Mckinney AveOct 9, 2025Install electrical · 85 m away
- 2529 Routh StJun 1, 2026Traffic signal installation · 87 m away
- 2400 Mckinney Av · Mckinney Oh LLCFeb 12, 2024Crisp & green mckinney — renovation/alteration — interior finish-out · 89 m away
- 2609 Hibernia StNov 4, 2025Demolition chain link fence and install mental post, wooden fence 8ft tall, top and trim · 109 m away
- 2615 Routh StNov 9, 2026Install construction fence around property for duration of demolition. provide consulting, specs & final report. demolish burned building & dispose of debris per neshap regulations. remove foundation system down to dirt; remove piers 2' below existing grade. backfill crawl space with common fill dirt up to existing dirt grade & rough grade. install silt fence around disturbed area. existing detached storage building & pavement to remain. load, transport & legally dispose of resultant debris · 109 m away