2530 Fairmount St
Dallas, TX 75203 · Tl Re LLC
Fairmount Restaurant renovation registered in Dallas
A 3,250-square-foot interior renovation with exterior updates is registered for Fairmount Restaurant at 2530 Fairmount St. The Texas Department of Licensing and Regulation record was filed on November 4, 2025, and lists an estimated project cost of $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 4, 2025
- since Nov 4, 2025
- Largest scope
- 3,250 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Finishing up · inspection nextFairmount Restaurant
3,250 sq ft · $1.0M est.
- RegisteredNov 4, 2025
- Plan review
- ConstructionJan '26 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectFull interior renovation with exterior updates as required. — fairmount restaurant
TDLR project registrationRenovation/AlterationReview Complete3,250 sq ft$1.0M est.- Project #
- TABS2026004988
- Tenant / owner
- Fairmount Restaurant
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2530 Fairmount St
What is being built at 2530 Fairmount St in Dallas?
The TDLR registration describes a full interior renovation with exterior updates for Fairmount Restaurant. It lists 3,250 square feet of work.
When was the Fairmount Restaurant renovation filed?
The project registration was filed on November 4, 2025. Its status is listed as Review Complete.
How much will the Fairmount Restaurant renovation cost?
The applicant’s estimated project cost is $1 million, according to the TDLR registration. This is an estimate, not a confirmed final cost.
Is a new restaurant opening at 2530 Fairmount St?
The record is for a renovation of Fairmount Restaurant, not a confirmed opening. It describes interior work and exterior updates.
What is being renovated near Whole Foods Market on McKinney Avenue?
Fairmount Restaurant at 2530 Fairmount St is registered for a 3,250-square-foot interior renovation with exterior updates. Whole Foods Market – Uptown Dallas is listed nearby, at 2510 McKinney Ave.
Also being built nearby
All of 75203- 2530 Fairmount StNov 3, 2026Assembly of the new indoor walk-in combo box and installation of the remote refrigeration equipment for the new cooler and freezer
- 2401 Mckinney AveSep 23, 2026Lvl6 garage qteam meeting 1.22.2026 (all day) phase i project, below grade garage up to lid of foundation proposed at this time to service future office tower. vertical drawings shown for reference of future phase · 37 m away
- 2425 Mckinney AveMay 18, 2026Demolish and haul away noted gold's gym structure and associated foundation · 37 m away
- 2510 Mckinney Ave · Lg Routh LPOct 21, 2026Interior remodel. demolition an existing bar (previously served alcohol/mixed drinks) and convert that space into a new coffee and juice bar. the current coffee and juice bar location will then be converted to house the wfmao program. project is a two-part relocation that cascades through both spaces · 49 m away
- 2515 Mckinney Ave · Chateau Plaza Holdings, LPSep 26, 2025Electrical interior remodel · 68 m away
- 2515 MckinneyJul 2, 2025Commercial plumbing · 68 m away
- 2523 Mckinney Ave · Or Asset Holdings LPOct 6, 2026Installing 13ft type 1 vent hood · 72 m away
- 2408 Mckinney AveOct 9, 2025Install electrical · 92 m away
- 2400 Mckinney Av · Mckinney Oh LLCFeb 12, 2024Crisp & green mckinney — renovation/alteration — interior finish-out · 95 m away
- 2529 Routh StJun 1, 2026Traffic signal installation · 114 m away
- 2615 Routh StNov 9, 2026Install construction fence around property for duration of demolition. provide consulting, specs & final report. demolish burned building & dispose of debris per neshap regulations. remove foundation system down to dirt; remove piers 2' below existing grade. backfill crawl space with common fill dirt up to existing dirt grade & rough grade. install silt fence around disturbed area. existing detached storage building & pavement to remain. load, transport & legally dispose of resultant debris · 118 m away
- 2512 Maple Ave · Old Warsaw RestaurantJan 22, 2026Qteam meeting 2.24.2026 (9am) front and side patio enclosure. new interior bar in rear of building · 120 m away
More restaurants in 75203.