2515 Mckinney
Dallas, TX 75201
Commercial plumbing permit filed at 2515 McKinney
A commercial plumbing permit was filed for 2515 McKinney in Dallas on July 2, 2025. The City of Dallas record does not specify the work details, project size, or valuation.
Summarized from City of Dallas records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2515 Mckinney
What is happening at 2515 McKinney in Dallas?
A City of Dallas permit record lists commercial plumbing work at the address, filed July 2, 2025. It does not provide further details about the work.
What is the permit number for 2515 McKinney?
The commercial plumbing permit number is COM-PLM-25-000648. It was filed on July 2, 2025.
Is a new business opening at 2515 McKinney?
The available record does not identify a business or tenant. It only describes the permitted work as commercial plumbing.
What is being built next to Punk Rock Pizza on McKinney?
At 2515 McKinney, next to Punk Rock Pizza at 2523 McKinney Ave, a commercial plumbing permit was filed on July 2, 2025. The record does not describe a new building or business.
What work is permitted near Whole Foods Market in Uptown Dallas?
The record for 2515 McKinney, about 55 meters from Whole Foods Market at 2510 McKinney Ave, lists commercial plumbing work. Permit COM-PLM-25-000648 was filed July 2, 2025.
Also being built nearby
All of 75201- 2515 Mckinney Ave · Chateau Plaza Holdings, LPSep 26, 2025Electrical interior remodel
- 2523 Mckinney Ave · Or Asset Holdings LPOct 6, 2026Installing 13ft type 1 vent hood · 5 m away
- 2529 Routh StJun 1, 2026Traffic signal installation · 49 m away
- 2425 Mckinney AveMay 18, 2026Demolish and haul away noted gold's gym structure and associated foundation · 51 m away
- 2510 Mckinney Ave · Lg Routh LPOct 21, 2026Interior remodel. demolition an existing bar (previously served alcohol/mixed drinks) and convert that space into a new coffee and juice bar. the current coffee and juice bar location will then be converted to house the wfmao program. project is a two-part relocation that cascades through both spaces · 55 m away
- 2615 Routh StNov 9, 2026Install construction fence around property for duration of demolition. provide consulting, specs & final report. demolish burned building & dispose of debris per neshap regulations. remove foundation system down to dirt; remove piers 2' below existing grade. backfill crawl space with common fill dirt up to existing dirt grade & rough grade. install silt fence around disturbed area. existing detached storage building & pavement to remain. load, transport & legally dispose of resultant debris · 59 m away
- 2602 Mckinney AveNov 11, 2020Interior remodel only · 64 m away
- 2401 Mckinney AveSep 23, 2026Lvl6 garage qteam meeting 1.22.2026 (all day) phase i project, below grade garage up to lid of foundation proposed at this time to service future office tower. vertical drawings shown for reference of future phase · 65 m away
- 2530 Fairmount StNov 3, 2026Assembly of the new indoor walk-in combo box and installation of the remote refrigeration equipment for the new cooler and freezer · 68 m away
- 2530 Fairmount St · Tl Re LLCNov 4, 2025Fairmount restaurant — renovation/alteration — full interior renovation with exterior updates as required · 68 m away
- 2609 Hibernia StNov 4, 2025Demolition chain link fence and install mental post, wooden fence 8ft tall, top and trim · 74 m away
- 2614 Hibernia StJan 19, 2021Replace or modify existing hvac · 86 m away