2601 Olive St., Dallas, TX 75201
Dallas, TX 75201 · Cousins 2601 Olive, LLC
The Link Level 01 gets interior demolition and new windows
A renovation at 2601 Olive St. involves demolishing an existing tenant-improvement space and adding new windows. A TDLR project registration filed July 16, 2026, describes work covering 5,908 square feet and lists an estimated project cost of $150,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2026
- since Jul 16, 2026
- Largest scope
- 5,908 sf
- Estimated cost
- $150K
- state registration
Where this project stands
Under constructionTHE LINK LEVEL 01 WHITEBOX
5,908 sq ft · $150K est.
- RegisteredJul 16, 2026
- Plan review
- ConstructionAug '26 – Jan '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectDemolition of an existing ti space, and addition of new windows. — the link at uptown
TDLR project registrationRenovation/AlterationReview Complete5,908 sq ft$150K est.- Project #
- TABS2026025410
- Tenant / owner
- The Link Level 01 Whitebox
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2601 Olive St., Dallas, TX 75201
What is being built at 2601 Olive St. in Dallas?
A TDLR registration describes renovation work at The Link Level 01, including demolition of an existing tenant-improvement space and the addition of new windows.
What work is planned at The Link Level 01?
The registration describes demolition of an existing tenant-improvement space and new windows. It lists the project as a renovation or alteration.
When was the 2601 Olive St. project filed?
The TDLR project registration was filed July 16, 2026. Its project number is TABS2026025410.
How large is the renovation at 2601 Olive St.?
The TDLR registration lists 5,908 square feet for the project.
What is the estimated cost of The Link Level 01 renovation?
The applicant's estimated cost for the project is $150,000, according to the TDLR registration.
What's being renovated near Ares Management - Phase 2?
At 2601 Olive St., The Link Level 01 project involves demolition of an existing tenant-improvement space and the addition of new windows. The registration was filed July 16, 2026.
What construction is planned near Griffin Highline in Dallas?
The Link Level 01 renovation at 2601 Olive St. includes interior demolition and new windows. The registration lists 5,908 square feet of work.
Also being built nearby
All of 75201- 2601 Olive Street · Cousins 2601 Olive LLCApr 14, 2026Ares management - phase 2 — renovation/alteration — modifying the offices in the existing tenant space
- 2601 Olive StJul 29, 2026Mcr interior white-box renovation of approximately 6,321 sq ft consisting of 4,675 sq ft at level 1 and 1,646 sq ft at the existing mezzanine level. scope includes demolition of existing lobby finishes, glazing systems, stair elements, partitions, ceilings, and associated mep systems; construction of new lobby architectural features, storefront entrance systems, guardrails, ceilings, finishes, and related structural, mechanical, electrical, plumbing, and fire protection work. existing occupancy remains business (group b). no increase in building area, height, or occupant load is proposed
- 2601 Olive Street, 23rd · The Link At Uptown, LLCMay 21, 2024Houlihan lokey - level 23 stair — new construction — subleasing the level 23, so houlihan lokey is walling in the monumental stair on level 23
- 2514 Harry Hines BlvdJan 6, 2021Renovation · 29 m away
- 2700 Olive StSep 22, 2020To complete work permit 1802231006 · 57 m away
- 2501 North Hardwood St · Horizon Propco I LPApr 17, 2026Confidential — renovation/alteration — interior renovation on level 19 of existing building. renovation includes the addition of secure doors · 80 m away
- 2501 N Harwood · Saint Ann Court (harwood District No. 6)Sep 2, 202612th floor restrooms — renovation/alteration — capital improvement · 80 m away
- 2501 N Harwood St · Horizon Propco I LPNov 12, 2026This is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed · 80 m away
- 2025 Cedar Springs RdOct 27, 2020Service release no work · 109 m away
- 2101 Cedar Sprigns Road · Rosewood Court, LLCMar 9, 2026Rosewood court - conference center — renovation/alteration — tenant improvement renovation · 114 m away
- 2101 Cedar Springs Road · Rosewood Court, LLCJun 22, 2026Griffin highline — renovation/alteration — tenant improvement · 114 m away
- 2101 Cedar Springs RdNov 16, 2026Replacement of 1/2" rpz device located at the dish machine inside of flower child · 114 m away
More demolitions in 75201.