2601 Olive Street, 23rd
Dallas, TX 75201 · The Link At Uptown, LLC
Level 23 stair enclosure planned at 2601 Olive Street
A TDLR project registration describes work to enclose the monumental stair on level 23 at 2601 Olive Street for Houlihan Lokey as it subleases the floor. The project was registered on May 21, 2024, and covers 600 square feet. The applicant’s estimated project cost is $51,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2024
- since May 21, 2024
- Largest scope
- 600 sf
- Estimated cost
- $51K
- state registration
Where this project stands
Finishing up · inspection nextHoulihan Lokey - Level 23 Stair
600 sq ft · $51K est.
- RegisteredMay 21, 2024
- Plan review
- ConstructionMay '24 – Oct '24
- Inspectednow
- Closed
Scheduled to finish Oct 31, 2024; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSubleasing the level 23, so houlihan lokey is walling in the monumental stair on level 23. — the link
TDLR project registrationNew ConstructionReview Complete600 sq ft$51K est.- Project #
- TABS2024019045
- Tenant / owner
- Houlihan Lokey - Level 23 Stair
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2601 Olive Street, 23rd
What is being built at 2601 Olive Street?
A TDLR registration describes enclosing the monumental stair on level 23 as part of Houlihan Lokey’s sublease of the floor. The registration was filed May 21, 2024.
Is a new building going up at 2601 Olive Street?
The registration describes work inside the existing building: enclosing a monumental stair on level 23. It does not describe construction of a new building.
When was the level 23 stair project at 2601 Olive filed?
The project was registered with TDLR on May 21, 2024. Its registration number is TABS2024019045.
How large is the 2601 Olive Street stair project?
The TDLR registration lists the project area as 600 square feet.
How much will the level 23 work at 2601 Olive Street cost?
The applicant’s estimated cost for the project is $51,000. This is an estimate, not a confirmed final cost.
What is being built near Cousins 2601 Olive?
The TDLR registration for 2601 Olive Street describes enclosing the monumental stair on level 23 for Houlihan Lokey. It was filed May 21, 2024.
Also being built nearby
All of 75201- 2601 Olive St., Dallas, TX 75201 · Cousins 2601 Olive, LLCJul 16, 2026The link level 01 whitebox — renovation/alteration — demolition of an existing ti space, and addition of new windows
- 2601 Olive Street · Cousins 2601 Olive LLCApr 14, 2026Ares management - phase 2 — renovation/alteration — modifying the offices in the existing tenant space
- 2601 Olive StJul 29, 2026Mcr interior white-box renovation of approximately 6,321 sq ft consisting of 4,675 sq ft at level 1 and 1,646 sq ft at the existing mezzanine level. scope includes demolition of existing lobby finishes, glazing systems, stair elements, partitions, ceilings, and associated mep systems; construction of new lobby architectural features, storefront entrance systems, guardrails, ceilings, finishes, and related structural, mechanical, electrical, plumbing, and fire protection work. existing occupancy remains business (group b). no increase in building area, height, or occupant load is proposed
- 2514 Harry Hines BlvdJan 6, 2021Renovation · 29 m away
- 2700 Olive StSep 22, 2020To complete work permit 1802231006 · 57 m away
- 2501 North Hardwood St · Horizon Propco I LPApr 17, 2026Confidential — renovation/alteration — interior renovation on level 19 of existing building. renovation includes the addition of secure doors · 80 m away
- 2501 N Harwood · Saint Ann Court (harwood District No. 6)Sep 2, 202612th floor restrooms — renovation/alteration — capital improvement · 80 m away
- 2501 N Harwood St · Horizon Propco I LPNov 12, 2026This is for the whole building: temporary disconnect/reconnect for maintenance and testing purposes only. a release to oncor will be needed · 80 m away
- 2025 Cedar Springs RdOct 27, 2020Service release no work · 109 m away
- 2101 Cedar Sprigns Road · Rosewood Court, LLCMar 9, 2026Rosewood court - conference center — renovation/alteration — tenant improvement renovation · 114 m away
- 2101 Cedar Springs Road · Rosewood Court, LLCJun 22, 2026Griffin highline — renovation/alteration — tenant improvement · 114 m away
- 2101 Cedar Springs RdNov 16, 2026Replacement of 1/2" rpz device located at the dish machine inside of flower child · 114 m away