groundranger
Historic · latest filing May 2025Commercial

1441 North Beckley Ave

Dallas, TX 75203 · Mdmc Icu/Burn Unit Upgrade, Mdmc Or Buildout

Burn-unit and operating-room renovations registered

Two renovations are planned within the multi-tenant medical facility at 1441 North Beckley Ave: upgrades to six ICU rooms and a hydrotherapy room for burn patients, plus two operating rooms and six PACU beds. Both projects were registered with TDLR on May 1, 2025. The applicant-estimated costs were $2.3 million for the ICU project and $2 million for the surgery-suite project.

Summarized from Texas Department of Licensing and Regulation records · updated May 1, 2025

Projects
2
2 filings
Latest filing
May 1, 2025
since May 1, 2025
Largest scope
4,750 sf
Estimated cost
$2.3M
state registration

Where this project stands

Completed

MDMC ICU/Burn Unit Upgrade

3,200 sq ft · $2.3M est.

  1. RegisteredMay 1, 2025
  2. Plan review
  3. ConstructionMay '25 – Oct '25
  4. Inspected
  5. Closed

Ran as a 5-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Upgrading 6 existing icu rooms to serve burn patients. renovating the existing space within the icu unit to build out a hydrotherapy room for burn patients. — methodist dallas medical center

    TDLR project registrationRenovation/AlterationProject Closed3,200 sq ft$2.3M est.
    Tenant / owner
    Mdmc Icu/Burn Unit Upgrade
    Design firm
    Pro
    Contact
    Pro
  2. MDMC OR Buildout

    This project includes renovation of existing areas within the surgery suite to build out 2 new operation rooms and 6 pacu beds in currently shelled spaces — methodist dallas medical center

    TDLR project registrationRenovation/AlterationProject Closed4,750 sq ft$2.0M est.
    Tenant / owner
    Mdmc Or Buildout
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1441 North Beckley Ave

What is being built at 1441 North Beckley Ave in Dallas?

TDLR records describe two renovations within the multi-tenant medical facility: an ICU burn-unit upgrade and a surgery-suite buildout with two operating rooms and six PACU beds. Both were registered May 1, 2025.

Is a new hospital being built at 1441 North Beckley Ave?

The records describe renovations to existing areas, not construction of a new hospital. One project upgrades six existing ICU rooms and adds a hydrotherapy room; the other adds operating rooms and PACU beds in shelled spaces.

What is the burn-unit project at 1441 North Beckley Ave?

The project upgrades six existing ICU rooms to serve burn patients and renovates space within the ICU for a hydrotherapy room. TDLR registration TABS2025017974 was filed May 1, 2025, with an applicant-estimated cost of $2.3 million.

Are new operating rooms being added at 1441 North Beckley Ave?

A surgery-suite renovation is planned to build out two operating rooms and six PACU beds in currently shelled spaces. The project is listed as TABS2025017969 and was registered May 1, 2025.

How much are the projects at 1441 North Beckley Ave estimated to cost?

The applicant estimated the ICU and burn-unit project at $2.3 million and the operating-room buildout at $2 million. These are estimates for the individual projects, not a reported total for the facility.

Also being built nearby

All of 75203

More medical facilities in 75203.

Get alerts for 1441 North Beckley Ave