1441 North Beckley Ave
Dallas, TX 75203 · Mdmc Icu/Burn Unit Upgrade, Mdmc Or Buildout
Burn-unit and operating-room renovations registered
Two renovations are planned within the multi-tenant medical facility at 1441 North Beckley Ave: upgrades to six ICU rooms and a hydrotherapy room for burn patients, plus two operating rooms and six PACU beds. Both projects were registered with TDLR on May 1, 2025. The applicant-estimated costs were $2.3 million for the ICU project and $2 million for the surgery-suite project.
Summarized from Texas Department of Licensing and Regulation records · updated May 1, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 1, 2025
- since May 1, 2025
- Largest scope
- 4,750 sf
- Estimated cost
- $2.3M
- state registration
Where this project stands
CompletedMDMC ICU/Burn Unit Upgrade
3,200 sq ft · $2.3M est.
- RegisteredMay 1, 2025
- Plan review
- ConstructionMay '25 – Oct '25
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsUpgrading 6 existing icu rooms to serve burn patients. renovating the existing space within the icu unit to build out a hydrotherapy room for burn patients. — methodist dallas medical center
TDLR project registrationRenovation/AlterationProject Closed3,200 sq ft$2.3M est.- Project #
- TABS2025017974
- Tenant / owner
- Mdmc Icu/Burn Unit Upgrade
- Design firm
- Pro
- Contact
- Pro
This project includes renovation of existing areas within the surgery suite to build out 2 new operation rooms and 6 pacu beds in currently shelled spaces — methodist dallas medical center
TDLR project registrationRenovation/AlterationProject Closed4,750 sq ft$2.0M est.- Project #
- TABS2025017969
- Tenant / owner
- Mdmc Or Buildout
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1441 North Beckley Ave
What is being built at 1441 North Beckley Ave in Dallas?
TDLR records describe two renovations within the multi-tenant medical facility: an ICU burn-unit upgrade and a surgery-suite buildout with two operating rooms and six PACU beds. Both were registered May 1, 2025.
Is a new hospital being built at 1441 North Beckley Ave?
The records describe renovations to existing areas, not construction of a new hospital. One project upgrades six existing ICU rooms and adds a hydrotherapy room; the other adds operating rooms and PACU beds in shelled spaces.
What is the burn-unit project at 1441 North Beckley Ave?
The project upgrades six existing ICU rooms to serve burn patients and renovates space within the ICU for a hydrotherapy room. TDLR registration TABS2025017974 was filed May 1, 2025, with an applicant-estimated cost of $2.3 million.
Are new operating rooms being added at 1441 North Beckley Ave?
A surgery-suite renovation is planned to build out two operating rooms and six PACU beds in currently shelled spaces. The project is listed as TABS2025017969 and was registered May 1, 2025.
How much are the projects at 1441 North Beckley Ave estimated to cost?
The applicant estimated the ICU and burn-unit project at $2.3 million and the operating-room buildout at $2 million. These are estimates for the individual projects, not a reported total for the facility.
Also being built nearby
All of 75203- 1441 N. Beckley Ave · Methodist Health SystemDec 4, 2025Mdmc schenkel levels 8 and 10 renovation — renovation/alteration — major and cosmetic renovation to existing medical/surgical patient floors 8 and 10 within an existing hospital
- 1441 N Beckley Ave · Methodist Hospitals Of DallasOct 19, 2026Modernization of 3 operating rooms being renovated consecutively. renovation includes mep work and updated finishes
- 1441 N Beckley AveSep 24, 2026Replacing dual duct boxes and minor ductwork
- 1441 N Beckley Avenue · Methodist Health SystemApr 18, 2024Mdmc dishroom reno — renovation/alteration — rebuild of existing dishwasher room after mold abatement
- 1441 North Beckley Avenue · Methodist Health System`Jan 26, 2024Mdmc fluoro #5 equipment replacement and renovation — renovation/alteration — imaging equipment replacement, renovation to adjacent patient toilet room
- 1411 N Beckley AveOct 15, 2020Interior remodel only- expanding suite #352 · 58 m away
- 1520 N Beckley AveOct 6, 2026Irrigation at leasing office · 153 m away
- 1338 Englewood DrOct 29, 2025Re-roof · 243 m away
- 1306 N Beckley AveAug 7, 2025Furnish and supply like to like gas package unit replacements for the equipment above. * permit * tie down details * with crane service lift new unit to roof * set and secure factory supplied curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer* connect system to existing ems equipment * install all factory supplied accessories, sensors, smoke detectors and economizers. * reconnect to existing duct work * start unit and verify all operations * verify communications with toc * clean job site * complete final permit inspection · 247 m away
- 1334 Englewood DrOct 29, 2025Re-roof · 249 m away
- 1327 Englewood DrAug 20, 2026Remodel existing plumbing on fire damaged house · 256 m away
- 1325 Englewood DrJun 4, 2025Apply gas pressure test for service reinstatement · 260 m away