Medical facility renovations include a new heart center
City of Dallas permits filed May 26, 2026, describe work on level 3 for rooms serving a new heart center, including new mechanical, plumbing and medical gas systems. Other 2026 permits cover a 10th-floor renovation and an 18-by-44-foot carport at the loading dock.
Summarized from City of Dallas records · updated Sep 24, 2026
- Projects
- 57
- 57 filings
- Latest filing
- Sep 24, 2026
- since Nov 23, 2020
- Largest scope
- —
- Listed value
- $35
- partial · often understated
Permit & project history
57 projectsRenovation of the 10th floor of the schenkel tower. add dedicated neutral conductors to existing circuits
Renovation of the 10th floor of the schenkel tower. add dedicated neutral conductors to existing circuits
City of Dallas permitCommercial Electrical PermitRenovation of the 10th floor of the schenkel tower. scope includes demolition, new plumbing, mechanical, electrical, flooring, millwork, ceilings, tile, and specialties
Renovation of the 10th floor of the schenkel tower. scope includes demolition, new plumbing, mechanical, electrical, flooring, millwork, ceilings, tile, and specialties
City of Dallas permitCommercial Alteration Addition PermitAddition of 18'x44' carport at loading dock area. carport to be mounted to existing concrete slab no foundation work needed. carport structural drawings included in permit submission and approx. location of carport submitted with site plan
Addition of 18'x44' carport at loading dock area. carport to be mounted to existing concrete slab no foundation work needed. carport structural drawings included in permit submission and approx. location of carport submitted with site plan
City of Dallas permitCommercial Alteration Addition PermitDemolition of existing level 3 rooms/area and adding plumbing and med gas systems to serve the new locker rooms, staff rooms, restrooms, hybird or, pacu, scrub, clean, soiled and anesthesia rooms that will serve as the new heart center
Demolition of existing level 3 rooms/area and adding plumbing and med gas systems to serve the new locker rooms, staff rooms, restrooms, hybird or, pacu, scrub, clean, soiled and anesthesia rooms that will serve as the new heart center
City of Dallas permitCommercial Plumbing PermitDemolition existing duct and mechanical piping on level 3 and install new duct, mechanical piping, and controls to serve new rooms. the equipment includes, air devices, vav's, vrf ac (indoor/outdoor) units, and exhaust fans
Demolition existing duct and mechanical piping on level 3 and install new duct, mechanical piping, and controls to serve new rooms. the equipment includes, air devices, vav's, vrf ac (indoor/outdoor) units, and exhaust fans
City of Dallas permitCommercial Mechanical PermitElectrical remodel includes, demolition, new lighting and controls, power, data back boxes, overhead conduits, power to hvac
Electrical remodel includes, demolition, new lighting and controls, power, data back boxes, overhead conduits, power to hvac
City of Dallas permitCommercial Electrical PermitQteam renovation of existing heart center on level 03 and addition of a rooftop exhaust fan, condensing unit, and basement ats
Qteam renovation of existing heart center on level 03 and addition of a rooftop exhaust fan, condensing unit, and basement ats
City of Dallas permitCommercial Alteration Addition PermitDemolition and remodel of existing space on 2nd floor to install new pathology lab. electrical portion will consist of new sub panel, receptacles, and new lighting
Demolition and remodel of existing space on 2nd floor to install new pathology lab. electrical portion will consist of new sub panel, receptacles, and new lighting
City of Dallas permitCommercial Electrical PermitThe electrical remodel scope includes making safe all affected circuits to ensure a secure work environment, followed by demolition of existing electrical components. new rough-in work will be performed, including installation of conduit, boxes, and wiring. new feeders will be run to support updated electrical loads, and additional panels will be installed as required. the scope also includes trim-out of all fixtures and devices, ensuring full functionality and compliance with applicable codes upon completion
The electrical remodel scope includes making safe all affected circuits to ensure a secure work environment, followed by demolition of existing electrical components. new rough-in work will be performed, including installation of conduit, boxes, and wiring. new feeders will be run to support updated electrical loads, and additional panels will be installed as required. the scope also includes trim-out of all fixtures and devices, ensuring full functionality and compliance with applicable codes upon completion
City of Dallas permitCommercial Electrical PermitQteam 3rd floor sammons tower - or buildoutinterior renovation area for 2 operating rooms
Qteam 3rd floor sammons tower - or buildoutinterior renovation area for 2 operating rooms
City of Dallas permitCommercial Alteration Addition Permit
+ 17 older projects. See the full history with a free trial.
Sources: City of Dallas
Questions about 1441 N Beckley Ave
What is being built at 1441 N Beckley Ave?
Permits describe renovations at a medical facility, including level 3 rooms serving a new heart center. They also cover work on the 10th floor and a carport at the loading dock.
Is a new heart center planned for 1441 N Beckley Ave?
A May 26, 2026 plumbing permit describes level 3 rooms, including operating and recovery spaces, that will serve as a new heart center. The permit number is COM-PLM-26-001941.
What work is planned for level 3 at 1441 N Beckley Ave?
Permits filed May 26, 2026, describe demolishing existing rooms and installing new mechanical and plumbing systems for spaces serving the heart center. The permits include COM-MEC-26-001266 and COM-PLM-26-001941.
What is being renovated on the 10th floor of Schenkel Tower?
A September 22, 2026 permit describes demolition and new plumbing, mechanical, electrical, flooring, millwork, ceilings, tile and other interior work. The permit number is COM-ALT-ADD-26-002048.
Is a carport being added at 1441 N Beckley Ave?
Yes. A September 16, 2026 permit describes an 18-by-44-foot carport at the loading dock, mounted to an existing concrete slab. The permit number is COM-ALT-ADD-26-002269.
When were permits filed for work at 1441 N Beckley Ave?
The records provided span May 27, 2025, through September 24, 2026. Recent permits filed in September 2026 include work on the 10th floor, the loading-dock carport, and plumbing and mechanical replacements.
Also being built nearby
All of 75208- 1441 N. Beckley Ave · Methodist Health SystemDec 4, 2025Mdmc schenkel levels 8 and 10 renovation — renovation/alteration — major and cosmetic renovation to existing medical/surgical patient floors 8 and 10 within an existing hospital
- 1441 N Beckley Ave · Methodist Hospitals Of DallasOct 19, 2026Modernization of 3 operating rooms being renovated consecutively. renovation includes mep work and updated finishes
- 1441 North Beckley Ave · Methodist Health SystemMay 1, 2025Mdmc icu/burn unit upgrade — renovation/alteration — upgrading 6 existing icu rooms to serve burn patients. renovating the existing space within the icu unit to build out a hydrotherapy room for burn patients
- 1441 N Beckley Avenue · Methodist Health SystemApr 18, 2024Mdmc dishroom reno — renovation/alteration — rebuild of existing dishwasher room after mold abatement
- 1441 North Beckley Avenue · Methodist Health System`Jan 26, 2024Mdmc fluoro #5 equipment replacement and renovation — renovation/alteration — imaging equipment replacement, renovation to adjacent patient toilet room
- 1411 N Beckley AveOct 15, 2020Interior remodel only- expanding suite #352 · 58 m away
- 1520 N Beckley AveOct 6, 2026Irrigation at leasing office · 153 m away
- 1338 Englewood DrOct 29, 2025Re-roof · 243 m away
- 1306 N Beckley AveAug 7, 2025Furnish and supply like to like gas package unit replacements for the equipment above. * permit * tie down details * with crane service lift new unit to roof * set and secure factory supplied curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer* connect system to existing ems equipment * install all factory supplied accessories, sensors, smoke detectors and economizers. * reconnect to existing duct work * start unit and verify all operations * verify communications with toc * clean job site * complete final permit inspection · 247 m away
- 1334 Englewood DrOct 29, 2025Re-roof · 249 m away
- 1327 Englewood DrAug 20, 2026Remodel existing plumbing on fire damaged house · 256 m away
- 1325 Englewood DrJun 4, 2025Apply gas pressure test for service reinstatement · 260 m away