1441 N. Beckley Ave
Dallas, TX 75248 · Methodist Health System
Medical and surgical floors 8 and 10 set for renovation
A 39,000-square-foot renovation is planned for existing medical and surgical patient floors 8 and 10 at the hospital listed as Methodist Dallas Medical Center. The TDLR project registration was filed on December 4, 2025; it describes major and cosmetic work. The applicant estimates the project cost at $14 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 4, 2025
- since Dec 4, 2025
- Largest scope
- 39,000 sf
- Estimated cost
- $14M
- state registration
Where this project stands
Under constructionMDMC Schenkel Levels 8 and 10 Renovation
39,000 sq ft · $14M est.
- RegisteredDec 4, 2025
- Plan review
- ConstructionMay '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectMajor and cosmetic renovation to existing medical/surgical patient floors 8 and 10 within an existing hospital — methodist dallas medical center
TDLR project registrationRenovation/AlterationReview Complete39,000 sq ft$14M est.- Project #
- TABS2026007250
- Tenant / owner
- Mdmc Schenkel Levels 8 And 10 Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1441 N. Beckley Ave
What is being renovated at 1441 N. Beckley Ave?
A TDLR registration describes major and cosmetic renovations to existing medical and surgical patient floors 8 and 10. The project is listed as a renovation at Methodist Dallas Medical Center.
When was the renovation at 1441 N. Beckley Ave filed?
The project registration was filed on December 4, 2025. Its TDLR number is TABS2026007250.
How large is the hospital renovation at 1441 N. Beckley Ave?
The TDLR registration lists the project at 39,000 square feet.
How much will the renovation at 1441 N. Beckley Ave cost?
The applicant's TDLR estimate is $14 million. This is an estimate for the project, not a confirmed final cost.
Is a new hospital being built at 1441 N. Beckley Ave?
The registration describes renovations to existing hospital patient floors, not construction of a new hospital.
What's being renovated near Hogg Elementary Renovation?
A 39,000-square-foot renovation of hospital patient floors 8 and 10 is registered at 1441 N. Beckley Ave, about 536 meters from Hogg Elementary Renovation at 1144 N. Madison Ave. The hospital project was filed on December 4, 2025.
Has the 1441 N. Beckley Ave renovation completed TDLR review?
The TDLR project registration lists the status as “Review Complete.”
Also being built nearby
All of 75248- 1441 N Beckley Ave · Methodist Hospitals Of DallasOct 19, 2026Modernization of 3 operating rooms being renovated consecutively. renovation includes mep work and updated finishes
- 1441 North Beckley Ave · Methodist Health SystemMay 1, 2025Mdmc icu/burn unit upgrade — renovation/alteration — upgrading 6 existing icu rooms to serve burn patients. renovating the existing space within the icu unit to build out a hydrotherapy room for burn patients
- 1441 N Beckley AveSep 24, 2026Replacing dual duct boxes and minor ductwork
- 1441 N Beckley Avenue · Methodist Health SystemApr 18, 2024Mdmc dishroom reno — renovation/alteration — rebuild of existing dishwasher room after mold abatement
- 1441 North Beckley Avenue · Methodist Health System`Jan 26, 2024Mdmc fluoro #5 equipment replacement and renovation — renovation/alteration — imaging equipment replacement, renovation to adjacent patient toilet room
- 1411 N Beckley AveOct 15, 2020Interior remodel only- expanding suite #352 · 58 m away
- 1520 N Beckley AveOct 6, 2026Irrigation at leasing office · 153 m away
- 1338 Englewood DrOct 29, 2025Re-roof · 243 m away
- 1306 N Beckley AveAug 7, 2025Furnish and supply like to like gas package unit replacements for the equipment above. * permit * tie down details * with crane service lift new unit to roof * set and secure factory supplied curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer* connect system to existing ems equipment * install all factory supplied accessories, sensors, smoke detectors and economizers. * reconnect to existing duct work * start unit and verify all operations * verify communications with toc * clean job site * complete final permit inspection · 247 m away
- 1334 Englewood DrOct 29, 2025Re-roof · 249 m away
- 1327 Englewood DrAug 20, 2026Remodel existing plumbing on fire damaged house · 256 m away
- 1325 Englewood DrJun 4, 2025Apply gas pressure test for service reinstatement · 260 m away