728 N Beckley Ave
Dallas, TX 75203
Permit for a 3-ton electric system at 728 N Beckley Ave
A City of Dallas residential mechanical permit records installation of a 3-ton straight electric system at 728 N Beckley Ave. The permit was filed May 11, 2026.
Summarized from City of Dallas records · updated May 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 11, 2026
- since May 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 728 N Beckley Ave
What is being built at 728 N Beckley Ave?
A City of Dallas residential mechanical permit records installation of a 3-ton straight electric system. The permit was filed May 11, 2026.
Is a new home being built at 728 N Beckley Ave?
The available permit is for residential mechanical work to install a 3-ton straight electric system. It does not describe new home construction.
What does permit RES-MEC-26-002238 cover?
Permit RES-MEC-26-002238 covers installation of a 3-ton straight electric system at 728 N Beckley Ave. It was filed May 11, 2026.
When was the permit filed for 728 N Beckley Ave?
The City of Dallas permit was filed May 11, 2026.
What is happening near The Barvin Group on W Davis Street?
A residential mechanical permit at 728 N Beckley Ave, about 188 meters from The Barvin Group, records installation of a 3-ton straight electric system. It was filed May 11, 2026.
Also being built nearby
All of 75203- 737 N Beckley AveOct 27, 2026Gas test · 18 m away
- 129 Oscar DrJan 22, 2026Gas inspection for meter release · 79 m away
- 138 Chester CtNov 13, 2025Install 15sq of iko dynasty · 86 m away
- 719 N Crawford StApr 20, 2026Gas test · 92 m away
- 736 N Zang BlvdOct 2, 2026Requesting gas test · 106 m away
- 719 N Zang BlvdMar 17, 2026Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints · 132 m away
- 809 N Crawford StJul 11, 2026Electrical service repair _ upgrade · 168 m away
- 811 N Crawford StOct 13, 2025Gas test:chimneykitchen 2water heater 2furnace · 171 m away
- 101 E Davis StSep 25, 2025New plumbing finish out grease waste sewer hot cold water system underground and top out and install fixtures · 186 m away
- 101 W Davis StSep 29, 2025Replace all new electrical · 186 m away
- 839 N Beckley AveOct 15, 20261-8 unitneeds site plan reveiw record, civil plans & mep plansconstruct 4 townhomes (1-8 consolidated dwelling unit) · 187 m away
- 111 W Davis St · The Barvin GroupApr 30, 2026Plumbing works as plan. sink connection, gas line and 4 rpz · 188 m away