737 N Beckley Ave
Dallas, TX 75203
Residential gas test permit filed at 737 N Beckley Ave
A residential plumbing permit for a gas test was filed at 737 N Beckley Ave on October 27, 2026. The record does not describe a new building or other construction work.
Summarized from City of Dallas records · updated Oct 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 27, 2026
- since Oct 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 737 N Beckley Ave
What is being built at 737 N Beckley Ave?
The City of Dallas record is for a residential gas test, not a new building project. It does not describe other construction work.
What was permitted at 737 N Beckley Ave?
A residential plumbing permit for a gas test was filed on October 27, 2026.
When was the gas test permit filed at 737 N Beckley Ave?
It was filed on October 27, 2026, under permit RES-PLM-26-011561.
Is a new home being built at 737 N Beckley Ave?
The available permit record does not indicate a new home build. It describes a gas test.
What is permit RES-PLM-26-011561 for?
The City of Dallas record describes it as a residential plumbing permit for a gas test, filed October 27, 2026.
Also being built nearby
All of 75203- 728 N Beckley AveMay 11, 2026Install 3 ton straight electric system · 18 m away
- 736 N Zang BlvdOct 2, 2026Requesting gas test · 92 m away
- 129 Oscar DrJan 22, 2026Gas inspection for meter release · 95 m away
- 138 Chester CtNov 13, 2025Install 15sq of iko dynasty · 99 m away
- 719 N Crawford StApr 20, 2026Gas test · 107 m away
- 719 N Zang BlvdMar 17, 2026Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints · 122 m away
- 809 N Crawford StJul 11, 2026Electrical service repair _ upgrade · 165 m away
- 811 N Crawford StOct 13, 2025Gas test:chimneykitchen 2water heater 2furnace · 168 m away
- 839 N Beckley AveOct 15, 20261-8 unitneeds site plan reveiw record, civil plans & mep plansconstruct 4 townhomes (1-8 consolidated dwelling unit) · 174 m away
- 824 N Crawford StJun 24, 2025Replacement of 3ton heatpump system · 194 m away
- 101 W Davis StSep 29, 2025Replace all new electrical · 198 m away
- 111 W Davis St · The Barvin GroupApr 30, 2026Plumbing works as plan. sink connection, gas line and 4 rpz · 199 m away