719 N Zang Blvd
Dallas, TX 75208
New multifamily building permitted at 719 N Zang Blvd
City of Dallas permits indicate a new multifamily apartment building is being constructed at 719 N Zang Blvd. The first filing was August 12, 2025; later permits cover plumbing, electrical work on three floors, and heat-pump systems, with the latest filings dated March 17, 2026.
Summarized from City of Dallas records · updated Mar 17, 2026
- Projects
- 14
- 14 filings
- Latest filing
- Mar 17, 2026
- since Aug 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
14 projectsMitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
City of Dallas permitCommercial Mechanical PermitMitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints.refrigerant line sets will be installed between indoor and outdoor equipment, insulated, pressure tested, evacuated, and charged according to manufacturer specifications
Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints.refrigerant line sets will be installed between indoor and outdoor equipment, insulated, pressure tested, evacuated, and charged according to manufacturer specifications
City of Dallas permitCommercial Mechanical PermitMitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
City of Dallas permitCommercial Mechanical PermitMitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
City of Dallas permitCommercial Mechanical PermitMitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints
City of Dallas permitCommercial Mechanical Permit
Sources: City of Dallas
Questions about 719 N Zang Blvd
What is being built at 719 N Zang Blvd?
City of Dallas permit records identify a new-construction multifamily building, described in the fact sheet as an apartment project. Permits cover plumbing, electrical work, and heat-pump systems.
When was the apartment project at 719 N Zang Blvd permitted?
The first filing was August 12, 2025. The latest permits in the records were filed March 17, 2026.
What do the permits say about the building at 719 N Zang Blvd?
The permits include electrical work for the site and floors 1 through 3, plumbing work, and Mitsubishi heat-pump systems for a new multifamily building.
How many units are planned at 719 N Zang Blvd?
The available permit description mentions plumbing for four units in building 1, but the records do not establish the total number of units in the project.
Is there a completion date for the 719 N Zang Blvd apartments?
The available City of Dallas records do not list a completion date. The latest filing shown is dated March 17, 2026.
What is the project cost for 719 N Zang Blvd?
The available records do not report a project cost or valuation.
Also being built nearby
All of 75208- 736 N Zang BlvdOct 2, 2026Requesting gas test · 40 m away
- 709 Elsbeth AveNov 12, 2025Replace a gas line for water heater and ac · 107 m away
- 737 N Beckley AveOct 27, 2026Gas test · 122 m away
- 728 N Beckley AveMay 11, 2026Install 3 ton straight electric system · 132 m away
- 210 W Canty StJan 28, 2021Electrical repairs · 179 m away
- 810 Elsbeth AveMay 27, 20263 pad & block set24 reinforced drill concrete piers1 spread footer with sonotube set192ft lineal feet of floor joist24 ft lineal feet of girder beam · 185 m away
- 215 W Canty StApr 7, 2026Relocate gas meter · 188 m away
- 835 N Zang BlvdJul 15, 2026Installing 8 steel pilings · 197 m away
- 111 W Davis St · The Barvin GroupApr 30, 2026Plumbing works as plan. sink connection, gas line and 4 rpz · 199 m away
- 101 W Davis StSep 29, 2025Replace all new electrical · 208 m away
- 129 Oscar DrJan 22, 2026Gas inspection for meter release · 210 m away
- 101 E Davis StSep 25, 2025New plumbing finish out grease waste sewer hot cold water system underground and top out and install fixtures · 216 m away