719 N Zang Blvd

Dallas, TX 75208

New multifamily building permitted at 719 N Zang Blvd

City of Dallas permits indicate a new multifamily apartment building is being constructed at 719 N Zang Blvd. The first filing was August 12, 2025; later permits cover plumbing, electrical work on three floors, and heat-pump systems, with the latest filings dated March 17, 2026.

Summarized from City of Dallas records · updated Mar 17, 2026

Projects
14
14 filings
Latest filing
Mar 17, 2026
since Aug 12, 2025
Largest scope
—
Listed value
—

Permit & project history

14 projects
  1. Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000686
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints.refrigerant line sets will be installed between indoor and outdoor equipment, insulated, pressure tested, evacuated, and charged according to manufacturer specifications

    Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints.refrigerant line sets will be installed between indoor and outdoor equipment, insulated, pressure tested, evacuated, and charged according to manufacturer specifications

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000684
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000688
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000690
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000687
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Install electrical for 1st floor

    Install electrical for 1st floor

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002545
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Install electrical for 2nd floor

    Install electrical for 2nd floor

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002544
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Install electrical for 3rd floor

    Install electrical for 3rd floor

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002543
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Install electrical for site

    Install electrical for site

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002542
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. New build, building 1 - plumbing to 4 units

    New build, building 1 - plumbing to 4 units

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001934
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Plumbing - 2nd floor

    Plumbing - 2nd floor

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001935
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Plumbing, 3rd floor

    Plumbing, 3rd floor

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001936
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. 12lf 6” sdr 2642lf 2” poly

    12lf 6” sdr 2642lf 2” poly

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001312
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. 12 lf 6" sdr 2642 lf 2" poly

    12 lf 6" sdr 2642 lf 2" poly

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-001228
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 719 N Zang Blvd

What is being built at 719 N Zang Blvd?

City of Dallas permit records identify a new-construction multifamily building, described in the fact sheet as an apartment project. Permits cover plumbing, electrical work, and heat-pump systems.

When was the apartment project at 719 N Zang Blvd permitted?

The first filing was August 12, 2025. The latest permits in the records were filed March 17, 2026.

What do the permits say about the building at 719 N Zang Blvd?

The permits include electrical work for the site and floors 1 through 3, plumbing work, and Mitsubishi heat-pump systems for a new multifamily building.

How many units are planned at 719 N Zang Blvd?

The available permit description mentions plumbing for four units in building 1, but the records do not establish the total number of units in the project.

Is there a completion date for the 719 N Zang Blvd apartments?

The available City of Dallas records do not list a completion date. The latest filing shown is dated March 17, 2026.

What is the project cost for 719 N Zang Blvd?

The available records do not report a project cost or valuation.