835 N Zang Blvd
Dallas, TX 75208
Eight steel pilings permitted at 835 N Zang Blvd
A City of Dallas permit filed July 15, 2026, covers installing eight steel pilings for commercial foundation repair at 835 N Zang Blvd. An earlier permit, filed June 27, 2025, covers replacing about 220 feet of an existing wood fence with an 8-foot cedar board-on-board fence.
Summarized from City of Dallas records · updated Jul 15, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jul 15, 2026
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsReplaced existing 8’ wood fence with new board on board 8 foot cedar fence. approximate length of fence to be replaced is 220’
Replaced existing 8’ wood fence with new board on board 8 foot cedar fence. approximate length of fence to be replaced is 220’
City of Dallas permitCommercial Accessory Structure Permit
Sources: City of Dallas
Questions about 835 N Zang Blvd
What work is permitted at 835 N Zang Blvd in Dallas?
A July 15, 2026, City of Dallas permit covers installing eight steel pilings for commercial foundation repair. A separate 2025 permit covers replacing an existing fence.
Is foundation repair planned at 835 N Zang Blvd?
Yes. Permit COM-FDN-26-000093, filed July 15, 2026, describes installing eight steel pilings under a commercial foundation repair permit.
What kind of fence is being installed at 835 N Zang Blvd?
Permit COM-ACC-25-000050, filed June 27, 2025, describes replacing an existing 8-foot wood fence with an 8-foot cedar board-on-board fence. The permit estimates the replacement length at about 220 feet.
When was the latest permit filed for 835 N Zang Blvd?
The latest filing in the available City of Dallas records is dated July 15, 2026. It is permit COM-FDN-26-000093 for installing eight steel pilings.
Is a new building being built at 835 N Zang Blvd?
The available records describe foundation repair and fence replacement work. They do not identify a new building project at this address.
Also being built nearby
All of 75208- 810 Elsbeth AveMay 27, 20263 pad & block set24 reinforced drill concrete piers1 spread footer with sonotube set192ft lineal feet of floor joist24 ft lineal feet of girder beam · 105 m away
- 839 N Beckley AveOct 15, 20261-8 unitneeds site plan reveiw record, civil plans & mep plansconstruct 4 townhomes (1-8 consolidated dwelling unit) · 118 m away
- 820 N Zang BlvdOct 14, 2020Service release no work · 127 m away
- 820 N Zang BlvdMay 13, 2026Clean and show · 127 m away
- 215 W Canty StApr 7, 2026Relocate gas meter · 136 m away
- 210 W Canty StJan 28, 2021Electrical repairs · 159 m away
- 901 Elsbeth AveJan 27, 2021Detached carport · 160 m away
- 736 N Zang BlvdOct 2, 2026Requesting gas test · 169 m away
- 105 E 6th StAug 28, 2026Foundation repair consisting of the installation of twenty-five (25) hydraulically pressed concrete piers along the exterior perimeter of the existing residence. the structure will be carefully raised and re-leveled as necessary to achieve the closest practical tolerance without causing damage to the existing structure. existing piers beneath the residence will be re-shimmed with steel shims as needed. upon completion, all existing structural wood components will be inspected to verify they are in good working condition. all work will be performed in accordance with the attached engineer's report, structural drawings, and repair details · 177 m away
- 975 N Zang BlvdAug 14, 2026Bu me pl el zo he finish-out of a 310 sq ft catering kitchen (within an existing building) without a commercial hood · 178 m away
- 719 N Zang BlvdMar 17, 2026Mitsubishi heat pump systems will be installed in a new construction multifamily building. indoor equipment will consist of upflow air handler style units installed within the closet spaces originally designed for vertical package units. closet openings and clearances must remain according to manufacturer specifications.each indoor unit will be installed with a filter base to allow proper filtration and service access. customer will provide the equipment bases that the indoor units will be set onto. regular 3 way vents and flat grills will be installed. drain line will be ran to dedicated hvac drain lines. each system will be equipped with a float switch to prevent water damages if the case of a clogged drain.a supply plenum will be installed on each indoor unit and only two supply outlets will be utilized as depicted on the mechanical blueprints · 197 m away
- 737 N Beckley AveOct 27, 2026Gas test · 207 m away