4409 Cole Ave
Dallas, TX 75205
4409 Cole Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 4409 Cole Ave, Dallas, TX 75205. The most recent, filed October 14, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Oct 14, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2020
- since Oct 14, 2020
- Largest scope
- —
- Listed value
- $35K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 4409 Cole Ave
What is being built at 4409 Cole Ave?
The latest filing (City of Dallas permit 2010146002, October 14, 2020) covers remove existing roof and install new roof.
How many permits and filings does 4409 Cole Ave have?
1 filing across 1 project, from October 14, 2020 to October 14, 2020.
How much is the construction at 4409 Cole Ave worth?
Permits at this address list about $35K in valuations. Permit valuations are often partial and understate total project cost.
What is being built near The Chapel Of The Cross, in Dallas?
4409 Cole Ave is about 152 m from The Chapel Of The Cross, (4333 Cole Ave). Its latest filing is for remove existing roof and install new roof.
Is there other construction near 4409 Cole Ave?
Yes. Nearby filings include 4423 Cole Ave (gate house for a 12 unit single family home community in a shared access development, Dec 4, 2025); 4444 Cole Ave (mcr remove and replace exterior siding, weather resistive barriers, and associated trim; inspect exposed sheathing and framing and repair or replace damaged components as required. install flashing and sealants at wall transitions, penetrations, and balcony edges. remove window mullion caps, install silicone sealant where required, and reinstall caps. repair balconies, including replacement of concrete topping slabs and drainage mats where indicated, correction of slopes for positive drainage, waterproofing repairs, and application of traffic coatings. repair or replace balcony fascia and soffits, install required vents, repair railing connections, and remove and reinstall railings as necessary for access. restore firestopping at affected penetrations and prime and paint repaired surfaces, Nov 3, 2026); 3132 Oliver St (replace or modify existing hvac, Nov 18, 2020).
How do I get alerts for new permits at 4409 Cole Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75205- 4423 Cole AveDec 4, 2025Gate house for a 12 unit single family home community in a shared access development · 27 m away
- 4444 Cole AveNov 3, 2026Mcr remove and replace exterior siding, weather resistive barriers, and associated trim; inspect exposed sheathing and framing and repair or replace damaged components as required. install flashing and sealants at wall transitions, penetrations, and balcony edges. remove window mullion caps, install silicone sealant where required, and reinstall caps. repair balconies, including replacement of concrete topping slabs and drainage mats where indicated, correction of slopes for positive drainage, waterproofing repairs, and application of traffic coatings. repair or replace balcony fascia and soffits, install required vents, repair railing connections, and remove and reinstall railings as necessary for access. restore firestopping at affected penetrations and prime and paint repaired surfaces · 71 m away
- 3132 Oliver StNov 18, 2020Replace or modify existing hvac · 101 m away
- 3128 Oliver StMar 7, 2026Replacing 50 gal gas wh · 107 m away
- 4418 Travis StFeb 12, 2026Demolition existing structure onsite · 129 m away
- 3113 Oliver StJul 30, 2025Gas test · 130 m away
- 4342 Cole AveFeb 4, 2026Installation of 6' tall ornamental fence · 133 m away
- 4401 Travis StAug 11, 2026Water heater installation · 141 m away
- 4411 Mckinney AveFeb 2, 2026Upflow installations located in a garage closet and a third-floor closet. closet installation. no new duct work. two existing rooftop condensers to be replaced. replacement of existing plywood equipment platform for the upstairs system · 143 m away
- 4425 Travis StMar 30, 2026100 gallon gas water heater replacement · 144 m away
- 4333 Cole Ave · The Chapel Of The Cross, Inc.Sep 8, 2026Replace existing unleveled, uneven city sidewalk along oliver st. by parking area and in front of the building approx: 260lnft x 4' wide replace existing city sidewalk and parkway pads along cole ave. 101lnft x 4' wide · 152 m away
- 4412 Mckinney AveJul 31, 2026Replace 4.0 ton rooftop system · 156 m away