Permits point to a 12-home community on Cole Avenue
Dallas permits indicate a 12-unit single-family home community with shared access is planned at 4423 Cole Ave. Filings from July through December 2025 include demolition of existing apartment buildings and a pool, a permit review for a single-family home, temporary construction power and a gatehouse permit dated Dec. 4, 2025.
Summarized from City of Dallas records · updated Dec 4, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Dec 4, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsTemporary power needed on site for powering security cameras and eventual vertical construction of single family homes
Temporary power needed on site for powering security cameras and eventual vertical construction of single family homes
City of Dallas permitCommercial Electrical PermitDemolish and haul away existing apartment buildings and foundations 2' below adjacent grade, existing pool, existing paving down to base, existing canopies and piers down 2' below adjacent grade, existing trees to be removed and hauled away
Demolish and haul away existing apartment buildings and foundations 2' below adjacent grade, existing pool, existing paving down to base, existing canopies and piers down 2' below adjacent grade, existing trees to be removed and hauled away
City of Dallas permitCommercial Demolition PermitTemporary power needed on site for the contractor to conduct abatement of asbestos. will remove services prior to demolition of the site
Temporary power needed on site for the contractor to conduct abatement of asbestos. will remove services prior to demolition of the site
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 4423 Cole Ave
What is being built at 4423 Cole Ave?
Dallas permit descriptions indicate a 12-unit single-family home community with shared access, including a gatehouse. A residential new construction permit review for a single-family home was filed Nov. 25, 2025.
Are the apartments at 4423 Cole Ave being demolished?
A City of Dallas demolition permit filed Aug. 4, 2025, describes removing existing apartment buildings, foundations, a pool, paving and other site features.
When was the gatehouse at 4423 Cole Ave permitted?
The City of Dallas issued a commercial new construction permit filing for a gatehouse on Dec. 4, 2025. The description identifies it as serving a 12-unit single-family home community with shared access.
What's being built near Joybird on McKinney Avenue?
Permits at 4423 Cole Ave, about 158 meters from Joybird at 4438 McKinney Avenue, indicate a 12-unit single-family home community with shared access. A gatehouse permit was filed Dec. 4, 2025.
Is a new home planned near the Garden, Narthex, and Tower Project?
A residential new construction permit review for a single-family home at 4423 Cole Ave was filed Nov. 25, 2025. The address is about 179 meters from the Garden, Narthex, and Tower Project at 4333 Cole Ave.
What did the demolition permit at 4423 Cole Ave cover?
Permit COM-DEM-25-000037, filed Aug. 4, 2025, describes removing existing apartment buildings and foundations, a pool, paving, canopies, piers and trees.
Also being built nearby
All of 75205- 4409 Cole AveOct 14, 2020Remove existing roof and install new roof · 27 m away
- 4444 Cole AveNov 3, 2026Mcr remove and replace exterior siding, weather resistive barriers, and associated trim; inspect exposed sheathing and framing and repair or replace damaged components as required. install flashing and sealants at wall transitions, penetrations, and balcony edges. remove window mullion caps, install silicone sealant where required, and reinstall caps. repair balconies, including replacement of concrete topping slabs and drainage mats where indicated, correction of slopes for positive drainage, waterproofing repairs, and application of traffic coatings. repair or replace balcony fascia and soffits, install required vents, repair railing connections, and remove and reinstall railings as necessary for access. restore firestopping at affected penetrations and prime and paint repaired surfaces · 44 m away
- 3132 Oliver StNov 18, 2020Replace or modify existing hvac · 109 m away
- 3128 Oliver StMar 7, 2026Replacing 50 gal gas wh · 113 m away
- 4418 Travis StFeb 12, 2026Demolition existing structure onsite · 127 m away
- 3113 Oliver StJul 30, 2025Gas test · 138 m away
- 4425 Travis StMar 30, 2026100 gallon gas water heater replacement · 140 m away
- 4411 Mckinney AveFeb 2, 2026Upflow installations located in a garage closet and a third-floor closet. closet installation. no new duct work. two existing rooftop condensers to be replaced. replacement of existing plywood equipment platform for the upstairs system · 144 m away
- 4401 Travis StAug 11, 2026Water heater installation · 146 m away
- 4412 Mckinney AveJul 31, 2026Replace 4.0 ton rooftop system · 156 m away
- 4438 Mckinney Avenue · Knox Promenade LLCNov 3, 2025Joybird — renovation/alteration — interior renovation of existing commercial space. installation of new partitions, finishes, and fixtures. minor modifications to existing electrical systems. no exterior work proposed under this project · 158 m away
- 4438 Mckinney Ave · Knox Promenade, LLCApr 14, 2026Plumbing fixture installation · 158 m away
More apartments & multifamily in 75205, demolitions in 75205, new homes in 75205.