4418 Travis St
Dallas, TX 75205
Dallas records show demolition at 4418 Travis St
City of Dallas permits document demolition work at 4418 Travis St, including removal of existing apartment buildings, a pool, paving, canopies and trees. The first demolition permit was filed August 4, 2025; a later permit dated February 12, 2026, also describes demolition of an existing structure.
Summarized from City of Dallas records · updated Feb 12, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Feb 12, 2026
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsTemporary power needed on site for the contractor to abate the asbestos in the existing building. after abatement is complete, the temporary pole will be removed and the contractor will demolition the building. prefer to have the pole in the center of the property
Temporary power needed on site for the contractor to abate the asbestos in the existing building. after abatement is complete, the temporary pole will be removed and the contractor will demolition the building. prefer to have the pole in the center of the property
City of Dallas permitCommercial Electrical PermitDemolish and haul away existing apartment buildings and foundations 2' below adjacent grad, existing pool, existing paving down to base, existing canopies and piers down 2' below adjacent grade, existing trees to be removed and hauled away
Demolish and haul away existing apartment buildings and foundations 2' below adjacent grad, existing pool, existing paving down to base, existing canopies and piers down 2' below adjacent grade, existing trees to be removed and hauled away
City of Dallas permitCommercial Demolition Permit
Sources: City of Dallas
Questions about 4418 Travis St
What is being built at 4418 Travis St?
The available City of Dallas permits document demolition, not new construction. They do not describe what may replace the existing buildings.
What is being demolished at 4418 Travis St in Dallas?
A demolition permit filed August 4, 2025 (COM-DEM-25-000038) lists existing apartment buildings and foundations, a pool, paving, canopies and trees. A February 12, 2026 permit (COM-DEM-26-000020) also describes demolition of an existing structure.
When were demolition permits filed for 4418 Travis St?
City of Dallas records show demolition permits filed August 4, 2025, and February 12, 2026. A commercial electrical permit for temporary power was filed August 13, 2025.
Why was temporary power permitted at 4418 Travis St?
The August 13, 2025 electrical permit (COM-ELC-25-001394) says temporary power was needed for asbestos abatement before demolition. It says the temporary pole would be removed after the abatement.
What's being demolished near Cienda Partners on Travis Street?
At 4418 Travis St, about 191 meters from Cienda Partners at 4514 Travis Street, a City of Dallas permit lists demolition of existing apartment buildings, a pool and other site features. The permit was filed August 4, 2025.
Is a new apartment building planned at 4418 Travis St?
The records identify the existing buildings as apartments and document demolition permits, but they do not provide details of a replacement building or construction schedule.
Also being built nearby
All of 75205- 4425 Travis StMar 30, 2026100 gallon gas water heater replacement · 17 m away
- 4401 Travis StAug 11, 2026Water heater installation · 36 m away
- 4402 Buena Vista StMay 8, 2026Roof replacement · 109 m away
- 4423 Cole AveDec 4, 2025Gate house for a 12 unit single family home community in a shared access development · 127 m away
- 4409 Cole AveOct 14, 2020Remove existing roof and install new roof · 129 m away
- 4444 Cole AveNov 3, 2026Mcr remove and replace exterior siding, weather resistive barriers, and associated trim; inspect exposed sheathing and framing and repair or replace damaged components as required. install flashing and sealants at wall transitions, penetrations, and balcony edges. remove window mullion caps, install silicone sealant where required, and reinstall caps. repair balconies, including replacement of concrete topping slabs and drainage mats where indicated, correction of slopes for positive drainage, waterproofing repairs, and application of traffic coatings. repair or replace balcony fascia and soffits, install required vents, repair railing connections, and remove and reinstall railings as necessary for access. restore firestopping at affected penetrations and prime and paint repaired surfaces · 148 m away
- 3221 Armstrong AveMar 20, 2026Install 50 gallon electric water heater in garage · 160 m away
- 3219 Armstrong AveAug 6, 2026Install 2 ton heatpump complete, install 3 ton heat pump complete rtu complete · 160 m away
- 3207 Armstrong AveMay 8, 2025Install new 50 gallon electric water heater · 163 m away
- 4501 Travis StApr 17, 2026Relocate gas lines across rooftop to new atmos meter location · 165 m away
- 4503 Travis StApr 23, 2026Relocate gas lines across rooftop to new atmos meter location · 168 m away
- 3330 Armstrong Ave · Kd Travis Block Holdco LLCOct 27, 2026Install new ductwork and slot grilles from existing split systems · 168 m away
More apartments & multifamily in 75205, demolitions in 75205, pools in 75205.