Four Level 2 EV charging stations planned at 2500 Bennett Ave

City of Dallas permits indicate four customer-supplied Level 2 charging stations are being installed at 2500 Bennett Ave. The electrical and commercial alteration permits were filed June 16 and June 18, 2026, and describe work using existing circuits, junction boxes and conduit.

Summarized from City of Dallas records · updated Jun 18, 2026

Projects
2
2 filings
Latest filing
Jun 18, 2026
since Jun 16, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Install (4) (customer supplied) level two charging stations. (load share)inspect (2) existing 240v 40a circuits and copper conductors.install (2) 6"x6"x6" nema 3 junction boxes.install (40') of 3/4" conduits from junction boxes to stations 1-4

    Install (4) (customer supplied) level two charging stations. (load share)inspect (2) existing 240v 40a circuits and copper conductors.install (2) 6"x6"x6" nema 3 junction boxes.install (40') of 3/4" conduits from junction boxes to stations 1-4

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001457
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install (4) (customer supplied) level two charging stations. (load share)inspect (2) existing 240v 40a circuits and copper conductors.install (2) 6"x6"x6" nema 3 junction boxes.install (40') of 3/4" conduits from junction boxes to stations 1-4

    Install (4) (customer supplied) level two charging stations. (load share)inspect (2) existing 240v 40a circuits and copper conductors.install (2) 6"x6"x6" nema 3 junction boxes.install (40') of 3/4" conduits from junction boxes to stations 1-4

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-002704
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2500 Bennett Ave

What is being installed at 2500 Bennett Ave in Dallas?

City of Dallas permits describe the installation of four customer-supplied Level 2 charging stations. The records also call for work on existing circuits, junction boxes and conduit.

When were the permits filed for 2500 Bennett Ave?

The electrical permit, COM-ELC-26-002704, was filed June 16, 2026. The commercial alteration permit, COM-ALT-ADD-26-001457, followed on June 18, 2026.

Are the permits for four EV chargers at 2500 Bennett Ave?

Yes. Both City of Dallas permits describe installing four Level 2 charging stations at the address.

What electrical work is planned for the charging stations?

The permits describe inspecting two existing 240-volt, 40-amp circuits and copper conductors, installing two junction boxes, and running 40 feet of conduit to the stations.

What is being built near Voro at 2500 Bennett Ave?

Permits for 2500 Bennett Ave, about 139 meters from Voro at 2500 Fitzhugh Ave, indicate four Level 2 charging stations are being installed. The permits were filed June 16 and June 18, 2026.